Permit: T10BU00919

Parcel: 10601247B


Addresses:

266 E PASTIME RD


Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T10BU00919

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
02/22/2012 GRADING - INTERMEDIATE Approved
08/04/2011 GRADING - INTERMEDIATE Continued 1) PLUMBING INSPECTOR LOOKED AT ROOF DRAINS AND PIPING.
2) CHANGE TO LENGTH OF SIDEWALK ALONG CHILD DROP OFF AREA
07/28/2011 GRADING - INTERMEDIATE Continued CONTRACTOR WORKING ON SITE TO INCLUDE DROP OFF AREA AND ACCESS FROM THE STREET. MAY NEED TO INSPECT ROOF DRAIN PIPING THAT WILL BE UNDERGROUND IF PLUMBING INSPECTOR DOESN'T LOOK AT IT.

CONTRACTOR WILL WANT TO OCCUPY THE BLDG AS SOON AS POSSIBLE, HOWEVER APPROVAL WILL NOT BE GIVEN UNTIL OCCUPANTS CAN SAFELY ACCESS AND USE THE BLDG WHILE CONSTRUCTION IS COMPLETED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/15/2011 GRADING - INTERMEDIATE Continued 1) CONTRACTOR WORKING ON SUBGRADE FOR VEHICLE AND PEDESTRIAN ACCESS OFF OF PAST TIME RD.
2) SOME CURBING AND SIDEWALKS HAVE BEEN POURED BOTH AT AND AROUND THE BLDG AND NORTH OF THE BLDG.
3) CONTRACTOR WANTS TO PROVIDE ACCESS AND OCCUPY THE BLDG BY EARLY AUG.
4) ENSURE THE PUBLIC HAS SAFE ACCESS TO THE BLDG AND THE BLDG IS ABLE TO BE USED FOR IT'S INTENDED PURPOSE.
SEPARATE ANY REMAINING CONSTRUCTION FROM THE PUBLIC.
06/21/2011 GRADING - INTERMEDIATE Continued 1) SITE CONSTRUCTION WILL BE DONE IN PHASES.
2) SOME CONCRETE CURB AND SIDE WALK INSTALLED.
3)CHANGE TO ROOF DRAINAGE AT SOUTH SIDE OF BLDG. CONTRACTOR WILL TIE ROOF DRAINS INTO EXISTING CATCH BASIN SUBGRADE. NEED TO SHOW REVISION ON APPROVED PLANS. NEED TO INSPECT INSTALLATION.
4) ACCESS ROAD CONSTRUCTION DUE TO BEGIN, ENSURE SWPPP CONTROLS ARE IN PLACE
5) PRIOR TO PUBLIC ACCESS, ALL ACCESS MUST BE SEPARATED FROM REMAINING CONSTRUCTION.
05/13/2011 GRADING - INTERMEDIATE Continued NO CHANGES
03/31/2011 GRADING - INTERMEDIATE Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
03/03/2011 GRADING - INTERMEDIATE Continued NO SIGNIFICANT CHANGES OR CONCERNS AT THIS TIME
02/11/2011 GRADING - INTERMEDIATE Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. NO SITE WORK BEING DONE CURRENTLY
01/25/2011 GRADING - INTERMEDIATE Continued MET WITH SUPERINTENDENT (RODNEY, CONCORD CONSTR. 419-4966) DISCUSSED SWPPP NON-COMPLIANCE ISSUES.

1) CONTRACTOR WILL RE-INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT ON SITE AND ENSURE SUBCONTRACTORS WILL USE IT.
2) CONTRACTOR WILL INSTALL A SECOND STABILIZED CONSTRUCTION ENTRANCE TO REDUCE TRACKING.
3) CONTRACTOR MUST SWEEP UP ALL TRACKED SOIL FROM THE SITE OFF THE PAVED ENTRACE TO THE SCHOOL .
4) CONTRACTOR MUST PERFORM STORM WATER SELF INSPECTIONS AND PER SWPPP AND DOCUMENT THEM
01/12/2011 GRADING - INTERMEDIATE Continued CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME.
1) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE. CONTRACTOR DISCHARGING WASTE CONCRETE AND MORTAR.
2) CLEAN UP WASTE CONCRETE.
3) ENSURE THE AREA OUTSIDE THE CONSTRUCTION SITE IS SWEPT ROUTINELY.
4) ENSURE INSTALLED SEDIMENT CONTROLS ARE MAINTAINED.

CORRECT BY 2 WEEKS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION.
12/17/2010 GRADING - INTERMEDIATE Continued NO STORM WATER CONCERNS AT THIS TIME.
SOME SITE WORK COMPLETED, CALL FOR ANY CHANGES TO THE APPROVED GRADING PLAN.
10/07/2010 GRADING - INTERMEDIATE Correction Required NO ACTIVITY ON SITE. >.5" RAIN, W/SOME TRACKING OF SOIL

1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
2) INSTALL SILT FENCE CORRECTLY, WITH BOTTOM OF FENCE TRENCHED INTO GROUND.
3) SWEEP UP TRACKING OFF OF PARKING AREA AND ADJACENT ROADWAY.


RODNEY W/ CONCORD CONSTR. 419-4966