Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - TIER REV
Permit Number - T10BU00919
Inspection Description - GRADING - TIER REV
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2012 | GRADING - TIER REV | Approved | AN AS-BUILT WAS SUBMITTED TO THE CITY OF TUCSON ALONG WITH A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD. ALL REQUIRED ITEMS HAVE BEEN COMPLETED | |
02/22/2012 | GRADING - TIER REV | Continued | 1) INSTALL HC ACCESS RAMP PER APPROVED GRADING PLAN, SEE NOTE #5A (NE CORNER). 2) INSTALL ROCK RIP RAP PER APPROVED GRADING PLAN AT SIDEWALK SCUPPER, SEE DETAIL "K", SHEET C0.1, TO INCLUDE TOE -DOWN WALL. 3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL CONSTRUCTED STORM DRAINAGE WAYS TO INCLUDE SUBGRADE ROOF DRAINAGE WAS SUBSTANTIALLY COMPLETED PER THE APPROVED PLAN. 4) SUBMITT A CERTIFIED AS-BUILT DRAWING TO THE CITY OF TUCSON. 5) REMOVE OLD SECTION OF SILT SOCK PLACED AT THE CHILD DROP OFF AREA. 6) HC PARKING SIGN ALONG WEST WALL OF WEST PARKING AREA HAS BEEN INSTALLED WITH NO PARKING SPOT AND/OR HC ACCESS RAMP. 7) HC PARKING AND ACCESS ALONG THE EAST SIDE OF THE BLDG. EXCEEDS THE 2% IN ANY DIRECTION SLOPE REQUIREMENT SHOWN ON YOUR APPROVED PLANS AND REQUIRED BY ADAAG/ANSI. 8) TWO MAIN ROOF DRAINS ALONG THE NORTH SIDE OF THE BLDG, DROP ONTO ATHE MAIN ACCESS SIDEWALK AND HC RAMP. 9) TRUNCATED DOMES AT HC CROSSING ALONG THE EAST SIDE OF THE BLDG ARE FACING THE WRONG DIRECTION. 10) PROVIDE A CITY OF TUCSON APPROVED GRADING PLAN FOR THE FINAL GRADING INSPECTION THAT SHOWS WHAT WAS BUILT OR CONSTRUCT THE SITE PER THE CITY OF TUCSON APPROVED GRADING PLAN. CALL FOR RE-INSPECTION WHEN COMPLETED. |
|
06/21/2011 | GRADING - TIER REV | Continued | 1) SITE CONSTRUCTION WILL BE DONE IN PHASES. 2) SOME CONCRETE CURB AND SIDE WALK INSTALLED. 3) CHANGE TO ROOF DRAINAGE AT SOUTH SIDE OF BLDG. CONTRACTOR WILL TIE ROOF DRAINS INTO EXISTING CATCH BASIN SUBGRADE. NEED TO SHOW REVISION ON APPROVED PLANS. NEED TO INSPECT INSTALLATION. 4) ACCESS ROAD CONSTRUCTION DUE TO BEGIN, ENSURE SWPPP CONTROLS ARE IN PLACE 5) PRIOR TO PUBLIC ACCESS, ALL ACCESS MUST BE SEPARATED FROM REMAINING CONSTRUCTION. |