Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T10BU00919
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2012 | STORMWATER INSTALL OF CONTROLS | Approved | ||
01/12/2011 | STORMWATER INSTALL OF CONTROLS | Continued | CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME. 1) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE. CONTRACTOR DISCHARGING WASTE CONCRETE AND MORTAR. 2) CLEAN UP WASTE CONCRETE. 3) ENSURE THE AREA OUTSIDE THE CONSTRUCTION SITE IS SWEPT ROUTINELY. 4) ENSURE INSTALLED SEDIMENT CONTROLS ARE MAINTAINED. CORRECT BY 2 WEEKS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
10/07/2010 | STORMWATER INSTALL OF CONTROLS | Correction Required | NO ACTIVITY ON SITE. >.5" RAIN, W/SOME TRACKING OF SOIL 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 2) INSTALL SILT FENCE CORRECTLY, WITH BOTTOM OF FENCE TRENCHED INTO GROUND. 3) SWEEP UP TRACKING OFF OF PARKING AREA AND ADJACENT ROADWAY. |