Permit: T09CM02664
Permit Details
Apply Date:
10/02/2009
Applicant:
N/A
Description:
DANCE STUDIO W/ 2ND FLOOR AS A RESIDENCE
Architects:
- FELTHEIM SCOTT
Contractors:
- PUEBLO MECHANICAL AND CONTROLS INC
Permit Reviews
Permit Number - T09CM02664
Permit Status: C of o
Permit Description: DANCE STUDIO W/ 2ND FLOOR AS A RESIDENCE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/02/2009 | PLANS OK TO SUBMIT - COMM | 10/02/2009 | COMPLETED |
10/02/2009 | COMMERCIAL NEW | 10/28/2009 | COMPLETED |
11/09/2009 | RESUBMITTAL | 12/10/2009 | COMPLETED |
12/10/2009 | RESUBMITTAL | 12/11/2009 | COMPLETED |
12/11/2009 | RESUBMITTAL | 12/22/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM02664
Permit Status: C of o
Permit Description: DANCE STUDIO W/ 2ND FLOOR AS A RESIDENCE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/02/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T09CM02664
Permit Description: DANCE STUDIO W/ 2ND FLOOR AS A RESIDENCE
Total Completed Inspections - 39
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/13/2010 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* 1) POST AN ADDRESS ON THIS SITE 2) THIS WILL REQUIRE RETEST AT INTERMEDIATE BECAUSE NO FITTINGS WILL BE UNTESTED ON SYSTEM AND INTERMEDIATE CLEANOUT FITTINGS ARE NOT INSTALLED |
01/13/2010 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* |
01/20/2010 | BUILDING PRE-SLAB | GDABBS | Approved | |
01/20/2010 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 1) CHECK OUT SHEET SD-1 DETAIL #1 BEFORE POUR |
01/20/2010 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
02/26/2010 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER R. JIROUDEK |
04/05/2010 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
04/05/2010 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
04/05/2010 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* |
04/05/2010 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
04/05/2010 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
04/20/2010 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* 1) REVISE PLANS TO SHOW THE ACTUAL DUCT SYSTEM INSTALLED 2) SHOW HOW RETURN AIR ON 1ST FLOOR WILL BE TERMINATED 3) LEAVE OFF SHEETROCK 2ND FLOOR EXHAUST TERMINATION |
04/30/2010 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
05/03/2010 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* 1) DRY WALL AT HARD LIDS-COMPLETE |
06/09/2010 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | FLUSH OKAY |
06/21/2010 | MECHANICAL - HYDRONIC PIPING | JMILITEL | Approved | IVRS - Inspection :* |
07/01/2010 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
07/01/2010 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
07/02/2010 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* |
07/02/2010 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
07/06/2010 | FIRE - FINAL | LThomas | Approved | Approved 7/6/10 |
07/08/2010 | FIRE SPKLR - FINAL | LThomas | Approved | Approved 7/8/19 |
07/08/2010 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
07/08/2010 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - TEMP POWER FOR TEST | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
07/08/2010 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* |
07/09/2010 | NPPO - FINAL | DROBERTS | Approved | |
08/11/2010 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
08/24/2010 | LANDSCAPE - FINAL | DROBERTS | Approved | |
08/24/2010 | ENGINEERING - FINAL | DROBERTS | Approved | |
08/27/2010 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) OK FOR FINAL |
08/31/2010 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
08/31/2010 | BUILDING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |
09/01/2010 | PERMIT FINALED | JWEATHER | Approved |