Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/02/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SUPPORT SOLAR PIPING ON ROOF AND COMPLETE INSULATION ON ALL HOT AND HOT RETURN PIPING. NOTE: INSULATION EXPOSED TO SUNLIGHT ? PROTECTION FROM SUNLIGHT (PAINT) 2) REMOVE HANDLE OR PROVIDE HOSE BIB CAP ON SOLAR LOOP HOSE BIB TO PREVENT SCALDING 3) PROVIDE SIGNAGE IN ELECTRICAL PANEL NON-BONDED, NON METALIC BLDG WATER PIPING 4) SEE NOTE #1.09 ON PAGE P2 AND PROVIDE STERILIZATION PROCEDURE USED IN WRITING WITH BACTERIA REPORT FROM WATER SAMPLE ? TO INDEPENDENT TESTING AGENCY 5) MAKIE UP STAIRS STOVE WATER TIGHT AT FLOOR |