Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T09CM02664

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/24/2010 ENGINEERING - FINAL Approved
08/10/2010 ENGINEERING - FINAL Partial Approval MET WITH JOSEPH LINVILLE AND DISCUSSED THE PLACMENT OF THE LANDSCAPING MATERIALS ON SITE AND IN THE RIGHT-OF-WAY. HE HAS NO ISSUES WITH THE MATERIAL BUT SUGGEST THAT WE CONTACT GARY WITTWER IN TRANSPORTATION DEPARTMENT AND ASK FOR HIS ADVISE SINCE PORTIONS OF IT IS IN THEIR AREA.
08/09/2010 ENGINEERING - FINAL Approved THE PREVIOUSLY NOTED PROBLEMS HAVE BEEN RESOLVED AT THIS TIME. THE ONLY REMAINING ITEMS WILL BE ADDRESSED IN THE LANDSCAPING COMMENTS.
07/07/2010 ENGINEERING - FINAL Partial Approval OK FOR THE TEMPORARY C OF O AT THIS TIME.
THE SITE HAS BEEN CHECKED TO ENSURE THAT IT HAS BEEN CONSTRUCTED PER THE APPROVED PLANS. THERE HAVE BEEN QUESTIONS RAISED AS TO THE ONSITE DRAINAGE THAT FLOWS ACROSS PEDESTRIAN ACCESS POINTS, AND THE USE OF TRUNCATED DOMES. THESE WILL BE DISCUSSED WITH THE REVIEWERS PRIOR TO APPROVING THE FINAO C OF O FOR THIS SITE.
07/01/2010 ENGINEERING - FINAL Denied THIS SITE HAS BEEN DENIED BECAUSE THE ROOF DRAINS FROM THE SITE DEPOSIT THE WATER DIRECTLY ONTO THE SIDEWALKS. THIS WILL NEED TO BE ADDRESSED PRIOR TO THE FINAL INSPECTION FOR THIS SITE AND THE ISSUANCE OF THE FINAL C OF O.