Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
665 N FREEWAY
Address NEW:
665 N FREEWAY
Apply Date:
01/25/2008
Applicant:
KENT A DELPH
Description:
GRADING
Contractors:
  • D J WILLIAMSON ENTERPRISES INC *C

Permit Reviews

Permit Number - T08BU00131
Permit Status: Final
Permit Description: GRADING
Start Date Submittal Complete Date Status  
01/25/2008 PLANS OK TO SUBMIT - GRADING 01/28/2008 COMPLETED Review Details
01/28/2008 GRADING 03/27/2008 COMPLETED Review Details
06/11/2008 RESUBMITTAL - GRADING ALL 07/07/2008 COMPLETED Review Details
07/30/2008 RESUBMITTAL - GRADING ALL 08/26/2008 COMPLETED Review Details
10/03/2008 RESUBMITTAL - GRADING ALL 10/27/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08BU00131
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
Date Name
01/25/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08BU00131
Permit Description: GRADING
Total Completed Inspections - 8
Date Description Inspector Results Comments
11/05/2008 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) INSTALL SILT SOCK ALONG WEST SIDE 1/2 WAY - SILT FENCE FOR THE REMAINDER.
2) INSTALL SILT FENCE ALONG NORTH SIDE OF SITE , WHERE MAJORITY OF STORM WATER WILL DISCHARGE.
3) INSTALL SILT FENCE 1/2 WAY ALONG EAST PERIMETER W/ SILT SOCK FOR THE REMAINDER OF THAT SIDE.
4) PERFORM PERIODIC SELF INSPECTIONS OF SEDIMENT CONTROLS AND DOCUMENT THEM.
5) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT UNTIL SITE IS STABILIZED.
6) SWEEP UP ANY TRACKING CAUSED FROM CONSTRUCTION TRAFFIC AND EQUIPMENT.
7) STORE HAZARDOUS/WASTE MATERIALS ON SITE PROPERLY PER PLAN, TO INCLUDE CONCRETE WASTE.
11/20/2008 STORMWATER INSTALL OF CONTROLS MRUSSO Approved STAKE DOWN SILT SOCK ALONG WEST SIDE OF SITE. ENSURE SOCK OVERLAPS AT EACH END.

ENSURE YOU PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR PLAN.

MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT, UNTIL THE SITE IS STABILIZED.

INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE PER PLAN.
12/16/2009 GRADING - FINAL MRUSSO Approved 1) REMOVE ALL STORM WATER TEMP SEDIMENT CONTROLS LEFT ON SITE.
2) INSTALL CURB OPENING AT LANDSCAPE ISLAND AT NW CORNER OF PARKING LOT, SEE NOTE #4.
3) RE-INSTALL 10' X 15' ROCK RIP RAP SPLASH PAD AT WEIR OPENING, PER PLAN.
4) PROVIDE 10' WEIR OPENING AT WALL FOR DRAINAGE AS SHOWN ON APPROVED PLAN.
5) PROVIDE 4' WIDE LANDING AT HC ACCESS RAMP ALONG NORTH SIDE OF HC PARKING.
6) COMPLETE ALL LANDSCAPING PER PLAN
7) INSTALL ROCK DRAINAGE SWALE SHOWN ON PLAN AT FRONT OF BLDG, SEE NOTE #8.
8) INSTALL CONCRETE HEADER W/VERT CURBING AND ROCK RIP RAP AS SHOWN ON APPROVED PLANS AT FAR SW CORNER OF SITE FOR DRAINAGE.
9) INSTALL WATER HARVESTING SIDEWALK SCUPPER AND TWO 2' WEIRS SHOWN ON PLANS.
12/16/2009 GRADING - INTERMEDIATE MRUSSO Approved
12/16/2009 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
12/16/2009 STORMWATER FOLLOW-UP INSP MRUSSO Approved
12/18/2009 LANDSCAPE INSPECTION ACONNOR Approved
01/19/2010 PERMIT FINALED KMEDINA Approved

Documents

File Name Document Type  
C1.TIF GRADING PLANS VIEW
C2.TIF GRADING PLANS VIEW
C3.TIF GRADING PLANS VIEW
C4.TIF GRADING PLANS VIEW
C5.TIF GRADING PLANS VIEW
C6.TIF GRADING PLANS VIEW
C6A.TIF GRADING PLANS VIEW
C7.TIF GRADING PLANS VIEW
001__8.TIF GRADING PLANS VIEW
002__1.TIF GRADING PLANS VIEW
003__1.TIF GRADING PLANS VIEW
004__1.TIF GRADING PLANS VIEW
GEOTECHNICALENGREPORT DOCUMENTS VIEW
None DOCUMENTS VIEW
BOND RELEASE LETTER 2010_08_19.PDF DOCUMENTS VIEW