Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL SILT SOCK ALONG WEST SIDE 1/2 WAY - SILT FENCE FOR THE REMAINDER. 2) INSTALL SILT FENCE ALONG NORTH SIDE OF SITE , WHERE MAJORITY OF STORM WATER WILL DISCHARGE. 3) INSTALL SILT FENCE 1/2 WAY ALONG EAST PERIMETER W/ SILT SOCK FOR THE REMAINDER OF THAT SIDE. 4) PERFORM PERIODIC SELF INSPECTIONS OF SEDIMENT CONTROLS AND DOCUMENT THEM. 5) MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT UNTIL SITE IS STABILIZED. 6) SWEEP UP ANY TRACKING CAUSED FROM CONSTRUCTION TRAFFIC AND EQUIPMENT. 7) STORE HAZARDOUS/WASTE MATERIALS ON SITE PROPERLY PER PLAN, TO INCLUDE CONCRETE WASTE. |