Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/11/2010 | GRADING - FINAL | Approved | ||
| 12/16/2009 | GRADING - FINAL | Denied | 1) REMOVE ALL STORM WATER TEMP SEDIMENT CONTROLS LEFT ON SITE. 2) INSTALL CURB OPENING AT LANDSCAPE ISLAND AT NW CORNER OF PARKING LOT, SEE NOTE #4. 3) RE-INSTALL 10' X 15' ROCK RIP RAP SPLASH PAD AT WEIR OPENING, PER PLAN. 4) PROVIDE 10' WEIR OPENING AT WALL FOR DRAINAGE AS SHOWN ON APPROVED PLAN. 5) PROVIDE 4' WIDE LANDING AT HC ACCESS RAMP ALONG NORTH SIDE OF HC PARKING. 6) COMPLETE ALL LANDSCAPING PER PLAN 7) INSTALL ROCK DRAINAGE SWALE SHOWN ON PLAN AT FRONT OF BLDG, SEE NOTE #8. 8) INSTALL CONCRETE HEADER W/VERT CURBING AND ROCK RIP RAP AS SHOWN ON APPROVED PLANS AT FAR SW CORNER OF SITE FOR DRAINAGE. 9) INSTALL WATER HARVESTING SIDEWALK SCUPPER AND TWO 2' WEIRS SHOWN ON PLANS. |