Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T08BU00131
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/13/2008 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
| 10/13/2008 | MICHAEL ST. PAUL | ZONING | REVIEW | Approv-Cond | Approvals from Engineering and Landscaping required. |
| 10/23/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: October 23, 2008 TO: Kent Delph, PE, Grenier Engineering SUBJECT: Country Inn Hotel Grading Plan Engineering Resubmittal Review LOCATION: 665 N Freeway ACTIVITY NUMBER: T08BU00131 SUMMARY: Engineering has received and reviewed the revised Grading Plan package of the Country Inn & Suites Building addition. Tucson Water documentation regarding the 20-ft water easement was received from Grenier Engineering, Inc. via email correspondence on October 23, 2008. Engineering Division recommends approval of the Site/Grading/Floodplain Use Permit applications. The following conditions apply to the grading permit and will need to be complied with during grading activities and completed prior to final grading construction inspection approval. GRADING PERMIT CONDITIONS: The following 26 conditions remain and apply for grading permit T08BU00131: 1) Call for DSD Engineering Inspection meetings. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2) A copy of the approved Grading Plans, SWPPP and Permits shall be kept at the site at all times, until final grading approval. 3) Limits of disturbance for this project is 79,058 sqft per sheet 7. 4) These sets of plans act as the approved grading plans for the Country Inn & Suites at 665 N Freeway. This grading permit T08BU00131 provides permission to perform private grading, paving, and drainage construction as shown on the approved plans sealed by Kent Delph, PE, dated 10-3-08. This Grading Plan, Geotechnical Report, Drainage Report, and SWPPP are for grading construction associated with the Private Improvement Grading & Paving Plan for Country Inn & Suites as shown on the approved Grading Plan T08BU00131. All work shall conform to the approved Third Submittal Drainage Report Country Inn & Suites sealed by Kent Delph, PE (7.29.8), and the Geotechnical Engineering Report prepared by Terracon, sealed by Brent Borchers (11/16/07), which is made part of this permit. 5) Heavy Duty Construction fence is required inside grading limits along Santa Cruz River side of the project. 6) The receiving waters for the SWPP is the Santa Cruz River. 7) For inspection purposes, post the "AZPDES - Posting Requirements" green sheet or NOI at construction entrances to the site at beginning of construction activities and maintain these posted documents throughout project construction. 8) Dust control methods such as water truck will be provided, as well as daily sweeping of the streets. 9) Designated concrete washout locations shall not be located in the courtyard, water harvest, basin, Santa Cruz River embankment areas. 10) For the Stormwater Pollution Prevention Plan, the construction entrance to begin at edge of impervious surface such as pavement or concrete at edge of property for a minimum of 50-ft. 11) See the associated Stormwater Pollution Prevention Plan as a part of this grading permit. Interim erosion and sediment controls shall be updated, revised, and maintained throughout the life of the project per approved grading plans and SWPPP at disturbance limits. Temporary erosion/stormwater controls may be field adjusted with discussions with operators and engineer of record as necessary within disturbance limits for this project. 12) Signatures for the operators on Certification Statements must be on the site copy of the Stormwater Pollution Prevention Plan (SWPPP) at, or before, commencement of construction. 13) Temporary erosion control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters. 14) Grading limits shall provide the required 2-ft offset from boundary limits. 15) Engineer of Record should be consulted for any revisions to the plans. Proposed revisions to the design must be discussed with a Civil Engineer at the City of Tucson Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 16) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 17) There shall be no disturbance along top of Santa Cruz River bank. There shall be no vehicle access, storage or any type of disturbance outside of the approved disturbance/grading limits as shown on the approved plans, and no grading shall begin until all required SWPPP controls are installed. Stop Work Order may be issued for disturbance outside of grading limits. 18) Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 19) Separate building permit applications are required for any walls. 20) All areas that are disturbed due to the construction activity for this project shall be stabilized. 21) Prior to requesting for release for CofO, final Grading Inspection approval by DSD Engineering is required. 22) Prior to final Grading Inspection approval, EOR shall provide Docket and Page for the 20-ft water easement on sheets 6 and 6A on the As-built grading plans. 23) Prior to request for final grading inspection approval, all permanent erosion control improvements shall be installed and accepted by DSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. 24) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. 25) Prior to request for final inspection approval, any outstanding fees shall be paid. 26) Letters of certification from Engineer of Record for project substantial completion of project, as well as a letter for the basin completion and function, and As-built Grading Plans are required per DS Sec.11-01.16, and shall be submitted prior to final grading inspection. If there are any questions you may contact me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |