Permit: T07CM04061
Permit Details
Apply Date:
10/15/2007
Applicant:
CATHERAINE SCARBROGH
Description:
TI: CHANGE OF USE MEDICAL CENTER
Architects:
- ROBBINS, DAVID BYRON
Contractors:
- CONCORD COMPANIES INC
Permit Reviews
Permit Number - T07CM04061
Permit Status: C of o
Permit Description: TI: CHANGE OF USE MEDICAL CENTER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2008 | 3RD PARTY REVIEW-COMMERCIAL TI | 04/08/2008 | COMPLETED |
04/08/2008 | POST 3RD PARTY REVIEW | 04/21/2008 | COMPLETED |
04/21/2008 | RESUBMITTAL | 04/23/2008 | COMPLETED |
10/15/2007 | PLANS OK TO SUBMIT - COMM | 01/29/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04061
Permit Status: C of o
Permit Description: TI: CHANGE OF USE MEDICAL CENTER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/15/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM04061
Permit Description: TI: CHANGE OF USE MEDICAL CENTER
Total Completed Inspections - 28
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/07/2008 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1. SINKS REQUIRE CLEANOUTS 2. CLEANOUTS TO OPEN IN THE DIRECTION OF FLOW 3. OK TO START BACKFILLING 4. TECHNICALLY THE SHORT SECTION OF 4" AT THE 4" X 2" REDUCER REQUIRED A FULL SIZE CLEANOUT. USING A TAPERED BUSHING IS THE PREFERRED METHOD. REINSPECTED - 2:00 P.M 1. CORRECTION MADE OK OK TO COVER 2. CALL 03015 FOR PRE-SLAB INSPECTION |
05/15/2008 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* OK FOR CONCRETE |
07/08/2008 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :* 1. GAS PRESSURE TEST OK 2. INSTALL ATMOSPHERIC VACUUM BREAKER ON HOSE BIB IMMEDIATELY! |
07/14/2008 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
07/14/2008 | ELECTRIC - TEMP POWER FOR TEST | RJIROUDE | Approved | IVRS - Inspection :* |
07/15/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER R. JIROUDEK |
07/18/2008 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* OK TO SET TILES PENDING PLUMBING ABOVE CEILING |
07/18/2008 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* 1. CALL 03035 FOR CLOSET FLANGE INSPECTION 2. CALL 03035 FOR YARD WATER PIPING NOTE: ALL YARDWATER PIPING TO BE INSTALLED A MINIMUM 12" DEEP TRACER TO BE CONTINUOUS |
07/18/2008 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* |
07/18/2008 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
07/21/2008 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
07/28/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES ON FINAL PROVIDE AIR BALANCE REPORT, ACCESS TO ROOF, PROVIDE R-8 INSULATION IN ALL EXPOSED DUCT ON ROOF AS PER PLANS AND CODE. RELIEF HOODS REQUIRE DAMPERS. |
08/01/2008 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* OK TO COVER ALL AREAS |
08/04/2008 | PLUMBING - FINAL | RMYERS | Approved | |
08/04/2008 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1. INADEQUATE NUMBER OF CLIPS ON SINKS 2. ALL I.W DRAINS TERMINATING INTO A FLOOR SINK TO HAVE FULL AIR GAP AND 90 DEG. 3. PUBLIC USE LAVATORIES REQUIRE MIXING VALVE 4. INSTALL PLUG IN WATER LINE UNDER SINK |
08/06/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
08/07/2008 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
08/07/2008 | NPPO - FINAL | ACONNOR | Approved | N/A |
08/07/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
08/08/2008 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL |
08/08/2008 | FIRE - FINAL | DRAMIREZ | Approved | |
08/08/2008 | ENGINEERING - FINAL | MRUSSO | Approved | |
08/19/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
09/30/2008 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
10/20/2008 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* WAITING ON FIELD EVAL. PAPER WORK |
10/20/2008 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
10/21/2008 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* TRADES & FIRE FINALS COMPLETE |
10/22/2008 | PERMIT FINALED | LJACKSON | Approved |