Description:
TI:RETAIL
Contractors:
  • BURKDELLE CONTRACTORS L L C

Permit Reviews

Permit Number - T07CM03275
Permit Status: C of o
Permit Description: TI:RETAIL
Start Date Submittal Complete Date Status  
08/06/2007 PLANS OK TO SUBMIT - 3RD PARTY 08/06/2007 COMPLETED Review Details
08/06/2007 3RD PARTY REVIEW-COMMERCIAL TI 09/12/2007 COMPLETED Review Details
09/12/2007 POST 3RD PARTY REVIEW 09/14/2007 COMPLETED Review Details
09/17/2007 POST 3RD PARTY REVIEW 09/17/2007 COMPLETED Review Details
12/31/2007 3RD PARTY REVIEW-REVISION/OTHER 12/31/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM03275
Permit Status: C of o
Permit Description: TI:RETAIL
Total Outstanding Activity Conditions - 1
Date Name
08/06/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T07CM03275
Permit Description: TI:RETAIL
Total Completed Inspections - 31
Date Description Inspector Results Comments
09/26/2007 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
SLAB INFILL FROM EXISTING BRICK WALLS TO THE SOUTH
EXTENT OF NEW BLDG. PAD
10/10/2007 EXCAVATION/LAYOUT REBAR & ZON AQUIROZ Approved IVRS - Inspection :*
10/15/2007 REINFORCED MASONRY PRE-GROUT AQUIROZ Approved IVRS - Inspection :*
10/24/2007 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
FIRE SHEETROCK (2 LAYERS) - 4 @ PARAPETS NORTH, EAST, SOUTH WALL (4' WRAP) - EAST & WEST - OK TO TAPE PROGRESS AREAS
10/26/2007 ROOF NAILING GDABBS Approved IVRS - Inspection :
See detailed listing on site.| 999*
NO ROOF TRUSS APPROVED SUBMITTALS ON SITE
NAILING @ ROOF SHEATHING OK TO PROCEED
11/05/2007 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
- CONDENSATE PIPING TO BE INCREASED TO 1" WHERE TWO UNITS ARE "TEE" TOGETHER
- GP-1 PROVIDE DUCT SUPPORT ON 14" DUCT SO THAT FLEX CONNECTOR IS NOT USED FOR SUPPORT
- GP-2 PROVIDE DUCT SUPPORT ON BOTH 10" DUCT SO FLEX CONNECTOR IS NOT USED FOR SUPPORT
11/05/2007 FRAMING JBURGE Approved IVRS - Inspection :*
OK TO SHEETROCK ONE SIDE; BOTH PENDING ELECTRIC & PLUMBING INTERMEDIATES
11/14/2007 ELECTRIC - INTERMEDIATE CCLEMENS Approved IVRS - Inspection :*
OK WALL COVER
NO SERVICE/PANEL INSPECTION AT THIS TIME
11/28/2007 PLUMBING - ROOF DRAINS RMYERS Approved IVRS - Inspection :*
1. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THREAD OF BRANCHES: THEN NO MORE THAN FOUR FEET BETWEEN HANGERS
2. NOT INSTALLED PER PLAN
ROOF DRAIN LOCATIONS AS REFERENCED ON A.1.3 ARE NOT ON THE PLUMBING PLAN - CHANGES TO THE PLAN MUST BE AUTHORIZED BY THE ENGINEER.
3. LAVATORY CARRIERS COVERED W/O INSPECTION
SEE NOTE ABOVE (11/13/07)
11/29/2007 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
12/04/2007 FIRE - FINAL CSCHULTZ Approved
12/10/2007 ELECTRIC - CABLE DROP CCLEMENS Approved IVRS - Inspection :
See detailed listing on site.| 999*
1. NEED TO POST BOND WITH CITY OF TUCSON FOR POWER
2. BOND NIPPLE BETWEEN METER BASE & DISCONNECT
(LUG LOOSE)
3. IDENTIFY "SERVICE DISCONNECT" AS SUCH
4. INSTALL FUSES
5. SECURE G.E.C TO STRUCTURE
6. IDENTIFY PHASE CONDUCTORS
7. TIGHTEN ALL CONNECTIONS
8. BOND WATER & GAS PIPES
9. FINISH ALL TRIM/NO OPEN WIRING
10. INSTALL PROPER LENGTH NIPPLE BETWEEN DISCONNECT AND PANEL. LOCKNUTS ARE REQUIRED BOTH SIDES ENTERING ENCLOSURES (2 INTO DISCONNECT, 2 INTO PANEL)
11. CLEAN OUT INSIDE OF PANEL

DO NOT CALL BEFORE ALL HAS BEEN COMPLETED
12/10/2007 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
ALL CHANGES TO THE PLAN, MUST BE ACCOMPANIED BY REDLINES. REDLINES ARE TO BE COMPLETED AT TIME OF INSPECTION. SUPPORT RPPBP TO WALL.
12/14/2007 ELECTRIC - TEMP POWER FOR TEST CCLEMENS Approved IVRS - Inspection :*
12/14/2007 TEP CLEARANCE - PM BFLORES Approved TEC PER C.CLEMENS
01/03/2008 ENGINEERING - FINAL MRUSSO Approved
01/03/2008 NPPO - FINAL ACONNOR Approved N/A
01/03/2008 LANDSCAPE - FINAL ACONNOR Approved N/A
01/03/2008 SIGN - FINAL JYBARRA Approved
01/04/2008 PLUMBING - GAS PRESSURE TEST RMYERS Approved IVRS - Inspection :*
01/07/2008 RIGHT OF WAY - FINAL MOTERO Approved PER EMAIL
01/07/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
01/08/2008 ELECTRIC - PROGRESS RJIROUDE Approved
01/08/2008 ELECTRIC - FINAL RJIROUDE Approved IVRS - Inspection :*
01/08/2008 ELECTRIC - ABOVE CEILING RJIROUDE Approved IVRS - Inspection :*
01/09/2008 PLUMBING - GAS PRESS TEST FNL RMYERS Approved IVRS - Inspection :*
01/09/2008 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection :*
01/11/2008 PLUMBING - FINAL RMYERS Approved IVRS - Inspection :*
1. NORMALLY I AFFIX THE GAS CARD TO THE HOUSE PIPING THERE IS NOT ENOUGH ROOM. DO NOT LOSE THIS CARD.
2. PLUMBING FINAL OK
01/11/2008 BUILDING - FINAL AQUIROZ Approved IVRS - Inspection :*
01/11/2008 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
01/11/2008 PLUMBING - PROGRESS RMYERS Approved IVRS - Inspection :*