Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2008 | ELECTRIC - CABLE DROP | Approved | IVRS - Inspection :* | |
| 12/10/2007 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO POST BOND WITH CITY OF TUCSON FOR POWER 2. BOND NIPPLE BETWEEN METER BASE & DISCONNECT (LUG LOOSE) 3. IDENTIFY "SERVICE DISCONNECT" AS SUCH 4. INSTALL FUSES 5. SECURE G.E.C TO STRUCTURE 6. IDENTIFY PHASE CONDUCTORS 7. TIGHTEN ALL CONNECTIONS 8. BOND WATER & GAS PIPES 9. FINISH ALL TRIM/NO OPEN WIRING 10. INSTALL PROPER LENGTH NIPPLE BETWEEN DISCONNECT AND PANEL. LOCKNUTS ARE REQUIRED BOTH SIDES ENTERING ENCLOSURES (2 INTO DISCONNECT, 2 INTO PANEL) 11. CLEAN OUT INSIDE OF PANEL DO NOT CALL BEFORE ALL HAS BEEN COMPLETED |