Permit: T06BU02959
Permit Details
Apply Date:
12/19/2006
Applicant:
INDEVCO A & E INC
Description:
GRADING:900CY CUT 900CY FILL
Contractors:
- JIM BROOKS
Permit Reviews
Permit Number - T06BU02959
Permit Status: Final
Permit Description: GRADING:900CY CUT 900CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2007 | RESUBMITTAL - GRADING ALL | 03/09/2007 | COMPLETED |
| 03/09/2007 | RESUBMITTAL - GRADING ALL | 04/04/2007 | COMPLETED |
| 11/19/2009 | REVISION - GRADING | 09/09/2010 | COMPLETED |
| 12/19/2006 | PLANS OK TO SUBMIT - GRADING | 12/19/2006 | COMPLETED |
| 12/19/2006 | GRADING | 01/22/2007 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T06BU02959
Permit Description: GRADING:900CY CUT 900CY FILL
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2007 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 05/11/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor needs to: 1- Stake down wattle every 4 feet. 2- fill holes under wattle. 3- seat wattle in ground. (small trench 2" deep) 4- Stop people from running wattle over. 5- tie off open ends of wattle. |
| 12/04/2008 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Met on site with Jim F. JIm want to mail out NOV for retail side of project. Contractor exceed grading limits. |
| 11/20/2009 | LANDSCAPE INSPECTION | CGROSS | Approved | |
| 12/02/2009 | ENGINEERING PRE-CONSTRUCTION | MCARREON | Approved | SPOKE WITH LOREN MAKUS REGARDING STATUS OF AS-BUILTS. APPROVAL WAS GIVEN 12/2/09. CALLED CONTRACTOR AND INFORMED HIM THAT AS-BUILTS HAD BEEN APPROVED. HE WILL CALL IN FOR FINAL INSPECTION EARLY NEXT WEEK.--NEED TO CHECK THAT COLLAR HAS BEEN PLACED ON BUBBLER AND THAT H/C SIGNAGE HEIGHT IS CORRECT. |
| 12/07/2009 | GRADING - FINAL | MCARREON | Approved | ALL PUNCH LIST ITEMS HAVE BEEN SATISFIED. |
| 12/09/2009 | PERMIT FINALED | MCARREON | Approved |