Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 02/09/2010 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 01/20/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor has to stop disturbing areas outside grading limits. Provide concrete wash out area. |
| 12/04/2008 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Met on site with Jim F. JIm want to mail out NOV for retail side of project. Contractor exceed grading limits. |
| 10/30/2008 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to install SWPPP controls. |
| 06/03/2008 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to address SWPPP issues with all 3 propertys. Spoke to Jim Brooks in regards to. Pictures taken of site. |
| 10/18/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor started building. No stormwater concerns at this time. |
| 09/28/2007 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to make repairs to SWPPP controls around site. |
| 08/09/2007 |
STORMWATER FOLLOW-UP INSP |
|
Not Applicable |
No activity on site at this time. |
| 07/15/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Met with Joe onsite, contractor is working outside of grading limits. Joe said they are working on plans to to build a school in area behind shopping center. I explained to Joe if they do not have approve drawings and have not started work on the school by the end of this project he will need to stabilize all areas disturbed. |
| 07/12/2007 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Need to met with Joe on site and go over grading limits. contractor operating outside limits. |
| 06/22/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor needs to extend SWPPP controls on west side of project. Spoke to Joe site super. |
| 06/07/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor installed security fence around site. |
| 05/16/2007 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to repair wattle and remove from street (Lostan). Contractor needs to install temp fencing to stop traffic driving across site. Spoke to Joe site super. |