Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2007 | STORMWATER INSTALL OF CONTROLS | Approved | Contractor needs to: 1- Stake down wattle every 4 feet. 2- fill holes under wattle. 3- seat wattle in ground. (small trench 2" deep) 4- Stop people from running wattle over. 5- tie off open ends of wattle. |
|
| 05/02/2007 | STORMWATER INSTALL OF CONTROLS | Partial Approval | Talk to Joe site super, contractor to start installing controls on 5/3/07. |