Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T05CM05714
Permit Details
Apply Date:
11/14/2005
Applicant:
PAUL DOMINGUEZ
Description:
ADDITION:OFFICE
Contractors:
- COSEC LAND DEVELOPMENT L L C
Permit Reviews
Permit Number - T05CM05714
Permit Status: C of o
Permit Description: ADDITION:OFFICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2007 | REVISION - - 1ST | 01/12/2007 | COMPLETED |
01/12/2007 | REVISION - - 1ST | 01/12/2007 | COMPLETED |
02/27/2006 | RESUBMITTAL | 03/10/2006 | COMPLETED |
03/24/2006 | RESUBMITTAL | 04/07/2006 | COMPLETED |
04/10/2006 | RESUBMITTAL | 04/20/2006 | COMPLETED |
04/20/2006 | RESUBMITTAL | 07/24/2006 | COMPLETED |
11/14/2005 | PLANS OK TO SUBMIT - COMM | 11/14/2005 | COMPLETED |
11/14/2005 | PLANS OK TO SUBMIT - SITE | 11/14/2005 | COMPLETED |
11/14/2005 | COMMERCIAL NEW | 12/19/2005 | COMPLETED |
11/14/2005 | SITE | 12/19/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM05714
Permit Status: C of o
Permit Description: ADDITION:OFFICE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/14/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM05714
Permit Description: ADDITION:OFFICE
Total Completed Inspections - 36
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/10/2006 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | |
08/17/2006 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
08/17/2006 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
08/21/2006 | ELECTRIC - UFER | RMAJUTA | Approved | 1) OK #4 BOND TO REBAR NEAR PANEL N. 2) NO UFER FOR SERVICE INSTALLED |
08/31/2006 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* |
08/31/2006 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | IVRS - Inspection :* |
09/22/2006 | STUCCO MESH | JBURGE | Approved | IVRS - Inspection :* OK TO STUCCO THROUGHOUT |
09/27/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE OK FOR SHEETROCK |
09/27/2006 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* RECEPTION TOILET RM OK TO COVER |
09/28/2006 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection :* OK BATHROOM & COUNTER WALLS |
10/09/2006 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* ENSURE THAT 3 @ AREAS NEEDING PATCHING ARE COMPLETED (MARKED ON WALLS) CHECK #6398 COSEC LAND DEVELOPMENT VOIDED AS PER LRH |
10/09/2006 | PLUMBING - YARD WTR LINE/TEST | BBENEDON | Approved | IVRS - Inspection :* |
11/03/2006 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
11/03/2006 | ELECTRIC - ABOVE CEILING | CCLEMENS | Approved | IVRS - Inspection :* |
11/06/2006 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
11/06/2006 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* OK TO COVER AT LAUNDRY, JANITORS ROOM AND BREAKROOM |
11/06/2006 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :* |
11/21/2006 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* SINGLE PHASE POWER IS UTILITY INSPECTION |
12/05/2006 | ELECTRIC - SERVICE UPGRADE | CCLEMENS | Approved | IVRS - Inspection :* 1. SERVICE IS NOT PER PLAN -- NEED TO INSTALL PER PLAN OR REVISE PLAN TO SHOW ACTUAL SCOPE OF WORK AND SHOW LOAD CORRECTLY IDENTIFIED IN THEIR PANEL ORIGINATIONS (SUB-PANELS ETC...) |
12/19/2006 | NPPO - FINAL | ACONNOR | Approved | |
12/19/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
12/19/2006 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
12/28/2006 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) REMOVE ALL TAPE FROM JOINTS AND SEAMS TO CHECK FOR PROPER OVERLAP 2) BANDING IS NOT DONE CORRECTLY 3) WRAP MUST EXTEND TO BOTTOM OF DUCT AND UP TO TOP OF CURB 4) NEED ACCESS INTO ATTIC-CANNOT SEE ROOF PENETRATIONS 5) READ THE INSTALL INSTRUCTIONS FOR PROPER BAND SPACING AND OVERLAPPING |
12/29/2006 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL |
01/18/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | INCR CLEARED PER C. CLEMENS |
02/15/2007 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
02/15/2007 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* I RECOMMEND REMOVING OLD FLUE PIPE TO PREVENT MOISTURE DAMAGE IN CEILING. |
02/15/2007 | PLUMBING - PROGRESS | BBENEDON | Approved | IVRS - Inspection :* |
02/22/2007 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |
02/22/2007 | OUTDOOR LIGHTING FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
02/22/2007 | ELECTRIC - FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
02/22/2007 | FIRE - FINAL | LLAKEY | Approved | |
02/22/2007 | FIRE - ALARM FINAL | LLAKEY | Approved | |
02/26/2007 | PERMIT FINALED | DROBEY | Approved | |
02/26/2007 | ENGINEERING - FINAL | MRUSSO | Approved | |
02/26/2007 | ENGINEERING - FINAL | MRUSSO | Approved | SITE WORK NOT COMPLETED. |