Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
09/08/2005
Applicant:
METRO PERMIT EXPRESS
Description:
NEW OFFICE BUILDING
Architects:
  • MORROW, KEVIN THOMAS
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T05CM04642
Permit Status: C of o
Permit Description: NEW OFFICE BUILDING
Start Date Submittal Complete Date Status  
09/08/2005 PLANS OK TO SUBMIT - 3RD PARTY 09/12/2005 COMPLETED Review Details
09/12/2005 3RD PARTY REVIEW-COMMERCIAL 10/25/2005 COMPLETED Review Details
09/26/2005 PLANS OK TO SUBMIT - SITE 09/26/2005 COMPLETED Review Details
09/28/2005 RESUBMITTAL - SITE 10/11/2005 COMPLETED Review Details
10/25/2005 POST 3RD PARTY REVIEW 01/20/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM04642
Permit Status: C of o
Permit Description: NEW OFFICE BUILDING
Total Outstanding Activity Conditions - 1
Date Name
09/08/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM04642
Permit Description: NEW OFFICE BUILDING
Total Completed Inspections - 52
Date Description Inspector Results Comments
04/13/2006 EXCAVATION/LAYOUT REBAR & ZON JCAGLE Approved IVRS - Inspection :*
ALL BUILDING FOOTINGS, SITE WALL FOOTINGS & TRASH ENCLOSURE
04/13/2006 ELECTRIC - UFER JCAGLE Approved IVRS - Inspection :*
04/21/2006 STEM WALL/RETAINING WALL JCAGLE Approved IVRS - Inspection :*
ALL MASONRY STEM WALLS (INCLUDING SITEWALL & TRASH ENCLOSURE)
05/02/2006 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
PIPE WRAPS & TAPE PRIMERS OK
NOTE: 2" DRAIN TO SUMP SHOULD BE A HORIZONTAL TERMINATION INTO SUMP PIT.
05/03/2006 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*
ELECTRIC INCOMPLETE.
05/03/2006 BUILDING PRE-SLAB RSUBA Approved IVRS - Inspection :*
05/18/2006 ELECTRIC - UNDERGROUND RSUBA Approved IVRS - Inspection :*
06/07/2006 REINFORCED MASONRY PRE-GROUT LHANLY Approved IVRS - Inspection :*
SPECIAL INSP. REPORTS REVIEWED & ACCEPTED.
08/18/2006 EXT METAL CLIPS/EXT SHEATHING GDABBS Approved IVRS - Inspection :*
ALL DENSGLASS OK TO COVER
08/30/2006 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
08/30/2006 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
09/27/2006 ELECTRIC - PROGRESS RSUBA Approved
10/02/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
10/18/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
OK FOR SHEETROCK BOTH FLOORS
FAN COILS WITHOUT SECONDARY DRAIN OUTLETS WILL REQUIRE EXTERNAL DRAIN PANS.
10/27/2006 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
12/07/2006 U VALUE FOR WINDOW GDABBS Approved IVRS - Inspection :*
12/07/2006 ELECTRIC - OUTDOOR LIGHTING RHOLLAND Approved IVRS - Inspection :*
12/11/2006 ELECTRIC - INTERMEDIATE RMAJUTA Approved IVRS - Inspection :*
12/13/2006 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
1. OK FOR CEILING TILES.
2. LEAVE OUT UNDER EACH FAN COIL.
3. NEED TO SEE DUCT SMOKE DETECTORS.
4. ON FINAL PROVIDE A SMOKE TEST.
5. RELOCATE LINE SET FAN COIL 4 BLOCKING ACCESS
12/13/2006 PLUMBING - PROGRESS RRICH Approved IVRS - Inspection :*
12/13/2006 PLUMBING - ROOF DRAINS RRICH Approved IVRS - Inspection :*
12/13/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
12/13/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
12/13/2006 ELECTRIC - ABOVE CEILING RMAJUTA Approved IVRS - Inspection :*
12/15/2006 TEP CLEARANCE - PM JWEATHER Approved TMPP CLEARED PER R. MAJUTA
12/15/2006 ELECTRIC - TEMP POWER FOR TEST RMAJUTA Approved OK FOR TEMP POWER
12/15/2006 RIGHT OF WAY - FINAL SDAMRON Approved PER EMAIL
12/18/2006 ELECTRIC - TEMPORARY SERVICE RMAJUTA Approved
12/18/2006 ELECTRIC - CABLE DROP RMAJUTA Approved OK TO CLEAR TEC ON BOND
CLEARANCE SUBJECT TO BOND
12/20/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
BLDG. INSPECTOR TO PICK UP AIR BALANCE REPORT
12/20/2006 MECHANICAL - PROGRESS JMILITEL Approved
12/20/2006 FIRE - FINAL LTHOMAS Approved
12/20/2006 FIRE SPKLR - FINAL LTHOMAS Approved
12/20/2006 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
12/20/2006 ENGINEERING - FINAL NKALAHAR Approved APPROVED
OUTSTANDING ITEMS TO BE HELD TO T05BU01722
12/21/2006 SITE - SEWER RRICH Approved IVRS - Inspection :*
APPROVED ON SEPARATE PERMIT
12/22/2006 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
1. PROPERLY SUPPORT VDV CABELING 760.6/725.6
2. CORDS NOT ALLOWED ABOVE CEILING 400.7 & 8

OK FOR TEMP C OF O
12/22/2006 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
LEAKING FLUSHOMETER WOMENS
CAULKING AT UPSTAIRS URINAL
SUPPORT PVC FOR ELEVATOR PUMP
USE FACTORY TAPPED CO PLUG IN ALL LOCATIONS
FLOOR DRAINS ARE TOO LOW IN LOWER TOILET RMS - CONTINUED BELOW
RECEIVED TWO BACKFLOW CERTS FOR FOUNTAIN AND PLANTER.
NEED BACKFLOW CERT FOR IRRIGATION, DATED AFTER REINSTALLATION. I SEE NO SAFETY HAZARDS THAT MIGHT PREVENT A TEMP C OF O
12/22/2006 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
APPROVED FOR TEMP C OF O ONLY (ELECT, MECH, PLUMBING OK'D FOR TEMP C OF O)

1. 2ND FLOOR RESTROOMS NEED NEW GRAB BARS INSTALLED
2. H/C RAMP BY WEST TRASH ENCLOSURE NEEDS TO BE REDONE -- EXISTING IS TOO STEEP
12/22/2006 BUILDING - PROGRESS GDABBS Approved IVRS - Inspection :*
12/22/2006 STUCCO MESH GDABBS Approved IVRS - Inspection :*
12/22/2006 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
12/22/2006 FRAMING GDABBS Approved IVRS - Inspection :*
12/22/2006 ROOF NAILING GDABBS Approved IVRS - Inspection :*
12/22/2006 NPPO - FINAL ACONNOR Approved
12/22/2006 LANDSCAPE - FINAL ACONNOR Approved OK for Temp C of O
12/27/2006 SIGN - FINAL CSTEPHEN Approved APPROVED FOR TEMPORARY C OF C
02/13/2007 OUTDOOR LIGHTING FINAL RHOLLAND Approved IVRS - Inspection :*
02/13/2007 ELECTRIC - CONSTRUCTION POWER RHOLLAND Approved IVRS - Inspection :*
02/16/2007 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
02/20/2007 FIRE - HYDRANTS LTHOMAS Approved
02/21/2007 PERMIT FINALED DROBEY Approved

Documents

File Name Document Type  
TEMP C OF O_12-27-2006.TIF CERT OF OCC VIEW
C OF O_02-21-2007.TIF CERT OF OCC VIEW
HYDROLOGICRPT.TIF DOCUMENTS VIEW
STRUCCALCS.TIF DOCUMENTS VIEW
STRUCCALCSREVISION.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW