Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
07/07/2005
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
NEW OFFICE BLDG
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T05CM03547
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Start Date Submittal Complete Date Status  
07/07/2005 PLANS OK TO SUBMIT - 3RD PARTY 07/08/2005 COMPLETED Review Details
07/08/2005 3RD PARTY REVIEW-COMMERCIAL 08/30/2005 COMPLETED Review Details
08/29/2005 SITE 09/12/2005 COMPLETED Review Details
08/30/2005 POST 3RD PARTY REVIEW 09/12/2005 COMPLETED Review Details
09/12/2005 RESUBMITTAL 09/12/2005 COMPLETED Review Details
11/21/2005 3RD PARTY REVIEW-REVISION/OTHER 11/30/2005 COMPLETED Review Details
12/30/2005 3RD PARTY REVIEW-REVISION/OTHER 01/10/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM03547
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date Name
07/07/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM03547
Permit Description: NEW OFFICE BLDG
Total Completed Inspections - 41
Date Description Inspector Results Comments
09/19/2005 TEP CLEARANCE - AM RMAJUTA Approved OK TEMP POWER POLE PER SUBA
10/03/2005 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :* PLACE COPPER UFER AT BOTTOM OF FOOTING & CLAMP TO REBAR PER 250 NEC OK
10/11/2005 STEM WALL/RETAINING WALL LHANLY Approved IVRS - Inspection :*PER CONVERSTION WITH ENGINEER SCOTT DUECKER REBAR L?? SPLICE IN MASONRY IS TO BE PER ACI 530 ( 48 BAR DIAMETER FOR GRADE 60) GSN'S DO NOT NOTE THIS INFORMATION
11/04/2005 EXCAVATION/LAYOUT REBAR & ZON JCAGLE Approved IVRS - Inspection :*COLUMN FOOTING @ LINES Z/1.5
11/04/2005 PLUMBING - SEWER HCS CONNECT RMYERS Approved IVRS - Inspection :*EITHER WAY I WILL BE BACK IN THE MORNING 10:50AM
PRIVATE MH #1 SUBJECT TO TEST
SDR 35 BETWEEN MH# 1 & MH #2
OK TO COVER SUBJECT TO TEST AND VERIFICATION OF GRADE
11/09/2005 ENGINEERING - FINAL MCARREON Approved CONTRACTOR MISTAKENLY REQUESTED A DSD ENGINEERING INSPECTION WHEN WHAT HE REQUIRED WAS A RIGHT OF WAY INSPECTION.
11/28/2005 REINFORCED MASONRY PRE-GROUT LHANLY Approved IVRS - Inspection :*TOP OUT SOUTH TOWER
12/06/2005 PLUMBING - ROUGH, SOIL RMYERS Approved IVRS - Inspection :*N/H UNDERGROUND COMPLETE
OK TO COMPLETE ALL AREAS
12/07/2005 PLUMBING - YARD WTR LINE/TEST RMYERS Approved IVRS - Inspection :*3" TYPE K UNDER STAIRWAY # 8 WI? RISER OK
NEED TO SEE CONNECTION TO PVC YARD WATER.
12/08/2005 ELECTRIC - UNDERGROUND RSUBA Approved IVRS - Inspection :*2ND FLOOR SOUTH 1/2
FLOOR FLOOR BOXES
12/19/2005 PLUMBING - ROOF DRAINS RMYERS Approved IVRS - Inspection :*4-4'' N/H ROOF DRAINS UP TO TEN FEET OK
SITE SEWER FROM M.H # 2 TO UPPER CLEAN-OUT AND 4" CONNECTION TO BLDG DRAIN OK
SUBJECT TO VERIFICATION OF GRADE AND TESTING
OK TO COVER
12/19/2005 SITE - SEWER RMYERS Approved IVRS - Inspection :*
12/21/2005 FRAMING LHANLY Approved IVRS - Inspection :*1) PLEASE PROVIDE MILL CERTIFICATION FOR STEEL FABRICATOR.
2) PROVIDE APPROVED SHOP DRAWINGS FOR STRUCTURED STEEL.
3) 1ST FLOOR STRUCTURAL STEEL CONFORMS TO PLAN/SPEC. INSP REVIEWED/ACCEPTED.
12/21/2005 BUILDING - FINAL LHANLY Approved IVRS - Inspection :*
12/27/2005 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*3RD FLOOR SUPER STRUCTURE OK. I STILLNEED SPECIAL INSP REPORTS P. FOR H.S BOLTS AND WELDS.
CONTRANCTOR HAS SUBSTITUTED A 12" ON STUGGER ( 6" O.C ON LINE) STUD PATTERN ON BY BEANS RATHER THAN TANDEM PATERN REQUIRED BY DETAIL. T24. CONTRACTOR TO PROVIDE RFI FROM ENGINEER FOR THIS STANDARD FIX. OK TO PLACE 3RD FLOOR SLAB
02/22/2006 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
02/23/2006 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
03/17/2006 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved IVRS - Inspection :*
04/04/2006 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
WALK THROUGH FOURTH FLOOR OVERHEAD
INSPECTED PARTITION INSTALLATION
OK TO COVER ALL AREAS, ALL FLOORS
05/30/2006 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection :*
OK TO COVER ALL AREAS ALL FLOORS.
05/31/2006 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
FINISH INSULATING SHEETMETAL DUCTS 4TH FLOOR.
DO NOT USE PLASTIC DRAIN HOSE IN THE R.A. PLENUM.
WILL CHECK ON FINAL
06/01/2006 ROOF NAILING LHANLY Approved IVRS - Inspection :*
06/01/2006 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :*
06/01/2006 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection :*
06/05/2006 RIGHT OF WAY - FINAL NBRIGGS Approved PER EMAIL
06/07/2006 U VALUE FOR WINDOW LHANLY Approved IVRS - Inspection :*
06/22/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
06/22/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved
06/22/2006 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
06/23/2006 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
06/26/2006 FIRE SPKLR - FINAL LTHOMAS Approved
06/26/2006 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
06/28/2006 FIRE - FINAL LTHOMAS Approved PER PHONE CALL
06/28/2006 OUTDOOR LIGHTING FINAL RSUBA Approved IVRS - Inspection :*
06/28/2006 ELECTRIC - OUTDOOR LIGHTING RSUBA Approved IVRS - Inspection :*
06/28/2006 ELECTRIC - CABLE DROP RSUBA Approved IVRS - Inspection :*
06/28/2006 ELECTRIC - ABOVE CEILING RSUBA Approved IVRS - Inspection :*
06/28/2006 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :*
06/29/2006 ELECTRIC - FINAL RSUBA Approved IVRS - Inspection :*
06/29/2006 ELECTRIC - TEMP POWER FOR TEST RSUBA Approved IVRS - Inspection :*
07/13/2006 LANDSCAPE - FINAL ACONNOR Approved

Documents

File Name Document Type  
COFO_07-17-2006.TIF CERT OF OCC VIEW
T05CM03547.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW