Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
06/02/2005
Applicant:
CAROLYN URIAS/SBBL
Description:
NEW OFFICE BLDG
Contractors:
  • TRIUMPH BUILDERS SOUTHWEST LLC *C*

Permit Reviews

Permit Number - T05CM02515
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Start Date Submittal Complete Date Status  
01/18/2006 3RD PARTY REVIEW-REVISION/OTHER 01/24/2006 COMPLETED Review Details
06/02/2005 PLANS OK TO SUBMIT - 3RD PARTY 06/03/2005 COMPLETED Review Details
06/03/2005 3RD PARTY REVIEW-COMMERCIAL 06/29/2005 COMPLETED Review Details
06/26/2006 3RD PARTY REVIEW-REVISION/OTHER 07/12/2006 COMPLETED Review Details
06/29/2005 POST 3RD PARTY REVIEW 07/08/2005 COMPLETED Review Details
07/27/2006 REVISION - - 1ST 08/02/2006 COMPLETED Review Details
08/03/2006 RESUBMITTAL 08/07/2006 COMPLETED Review Details
10/20/2005 3RD PARTY REVIEW-REVISION/OTHER 12/09/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM02515
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date Name
06/02/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM02515
Permit Description: NEW OFFICE BLDG
Total Completed Inspections - 46
Date Description Inspector Results Comments
09/23/2005 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
09/29/2005 ELECTRIC - UFER LHANLY Approved IVRS - Inspection :* AT PARKING GARAGE NEAR 1-G FOR "SITE" PANEL OK.
10/18/2005 SITE - SEWER TRINIVJR Approved IVRS - Inspection :*VACCUM TEST FOR M.H # 2 IS OK
VACCUM TEST FOR MH #1 IS OK
10/26/2005 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*100 PSI TEST ON 4" H20 BUILDING SUPPLY STUB UP & OUT 5" WEST SIDE OK
PIPE WRAPS & TRAP PRIMERS FROM COLUMN LINE # 4 SOUTH OK. 7-4" RAIN DRAIN STUBS OUT OF BUILDING ON EAST SIDE OK
11/02/2005 ELECTRIC - TEMPORARY SERVICE RSUBA Approved IVRS - Inspection :*OK TO CLEAR 250 S WILLIAM TEMP SERVICE
11/03/2005 TEP CLEARANCE - AM JKOZUCH Approved
11/07/2005 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved SEPARATE PLAN AND PERMIT REQUIRED FOR INSTQALLATION OF UNDERGROUND FIRE SPRINKLER PIPING.
11/15/2005 PLUMBING - YARD WTR LINE/TEST BBENEDON Approved IVRS - Inspection :*
12/08/2005 ELECTRIC - UNDERGROUND RSUBA Approved IVRS - Inspection :*PARTIAL 2ND FLOOR SOUTH 1/2
FOOR BOXES
12/14/2005 STEM WALL/RETAINING WALL LHANLY Approved IVRS - Inspection :*OUTSIDE ( NORTH) RAMP WALL TO 25' FROM END
12/16/2005 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*3RD FLOOR SOUTH 1/2
SUPPORTING ??? STRUCTURE, DECK WELDS AND STUDS (??)
OK TO PLACE CONCRETE- I STILL NEED TO SEE SPECIAL REPORTS
12/16/2005 ROOF NAILING LHANLY Approved IVRS - Inspection :*DECK INSP NOT ROOF
12/16/2005 FRAMING LHANLY Approved IVRS - Inspection :*
12/27/2005 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :*OK SOUTH STAIR WITH TOE DOWN
02/24/2006 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
03/27/2006 ELECTRIC - CABLE DROP RSUBA Approved IVRS - Inspection :*
03/30/2006 ELECTRIC - TEMP POWER FOR TEST RSUBA Approved IVRS - Inspection :*
1) POWER TO BE UTILIZED AS DISCUSSED WITH JAY AT CASCADE ELECTRIC
05/16/2006 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved 1. STUCCO MESH @ ROOF
AND SKIM ON MECHANICAL
07/12/2006 PLUMBING - ROOF DRAINS RRICH Approved IVRS - Inspection :*
07/12/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
07/14/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
REVISED APPROVED PLANS ON SITE.
08/02/2006 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
08/11/2006 MECHANICAL - HOOD SYSTEMS JMILITEL Approved IVRS - Inspection :*
08/11/2006 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
FIRE WRAP OK
OK FOR CEILING TILES -- 1ST FLOOR
08/15/2006 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
08/17/2006 RIGHT OF WAY - FINAL NBRIGGS Approved PER EMAIL
08/18/2006 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :*
08/18/2006 REINFORCED MASONRY PRE-GROUT LHANLY Approved IVRS - Inspection :*
08/18/2006 ELECTRIC - ABOVE CEILING RSUBA Approved IVRS - Inspection :*
08/18/2006 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :*
08/18/2006 ELECTRIC - OUTDOOR LIGHTING RSUBA Approved IVRS - Inspection :*
08/21/2006 MECHANICAL - HOODS JMILITEL Approved IVRS - Inspection :*
08/21/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
RECEIVED (1) COPY BACTERIA REPORT OK
PROVIDE ANSUL VALVE SIGN LOCATION.
08/21/2006 FIRE - FINAL LLAKEY Approved
08/21/2006 FIRE - KITCHEN EXH HOOD FINAL LLAKEY Approved
08/21/2006 FIRE SPKLR - FINAL LTHOMAS Approved
08/21/2006 ELECTRIC - FINAL RSUBA Approved IVRS - Inspection :*
08/21/2006 U VALUE FOR WINDOW LHANLY Approved IVRS - Inspection :*
08/25/2006 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*
08/28/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved
09/14/2006 LANDSCAPE - FINAL ACONNOR Approved
09/15/2006 ENGINEERING - FINAL NKALAHAR Approved ALL PUNCHLIST ITEMS ADDRESSED
09/15/2006 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
09/18/2006 PERMIT FINALED DROBEY Approved
09/18/2006 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
09/18/2006 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved

Documents

File Name Document Type  
C OF O_09-18-2006.TIF CERT OF OCC VIEW
TEMP C OF O_08-25-2006.TIF CERT OF OCC VIEW
TEMP C OF O_08-21-2006.TIF CERT OF OCC VIEW
INSPECTIONS.TIF DOCUMENTS VIEW
INSPECTIONS2.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW