Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 01/24/2006 | COMPLETED |
06/02/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 06/03/2005 | COMPLETED |
06/03/2005 | 3RD PARTY REVIEW-COMMERCIAL | 06/29/2005 | COMPLETED |
06/26/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 07/12/2006 | COMPLETED |
06/29/2005 | POST 3RD PARTY REVIEW | 07/08/2005 | COMPLETED |
07/27/2006 | REVISION - - 1ST | 08/02/2006 | COMPLETED |
08/03/2006 | RESUBMITTAL | 08/07/2006 | COMPLETED |
10/20/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 12/09/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM02515
Permit Status: C of o
Permit Description: NEW OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/02/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM02515
Permit Description: NEW OFFICE BLDG
Total Completed Inspections - 46
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2005 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* |
09/29/2005 | ELECTRIC - UFER | LHANLY | Approved | IVRS - Inspection :* AT PARKING GARAGE NEAR 1-G FOR "SITE" PANEL OK. |
10/18/2005 | SITE - SEWER | TRINIVJR | Approved | IVRS - Inspection :*VACCUM TEST FOR M.H # 2 IS OK VACCUM TEST FOR MH #1 IS OK |
10/26/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :*100 PSI TEST ON 4" H20 BUILDING SUPPLY STUB UP & OUT 5" WEST SIDE OK PIPE WRAPS & TRAP PRIMERS FROM COLUMN LINE # 4 SOUTH OK. 7-4" RAIN DRAIN STUBS OUT OF BUILDING ON EAST SIDE OK |
11/02/2005 | ELECTRIC - TEMPORARY SERVICE | RSUBA | Approved | IVRS - Inspection :*OK TO CLEAR 250 S WILLIAM TEMP SERVICE |
11/03/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | |
11/07/2005 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | SEPARATE PLAN AND PERMIT REQUIRED FOR INSTQALLATION OF UNDERGROUND FIRE SPRINKLER PIPING. |
11/15/2005 | PLUMBING - YARD WTR LINE/TEST | BBENEDON | Approved | IVRS - Inspection :* |
12/08/2005 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :*PARTIAL 2ND FLOOR SOUTH 1/2 FOOR BOXES |
12/14/2005 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :*OUTSIDE ( NORTH) RAMP WALL TO 25' FROM END |
12/16/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :*3RD FLOOR SOUTH 1/2 SUPPORTING ??? STRUCTURE, DECK WELDS AND STUDS (??) OK TO PLACE CONCRETE- I STILL NEED TO SEE SPECIAL REPORTS |
12/16/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :*DECK INSP NOT ROOF |
12/16/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
12/27/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :*OK SOUTH STAIR WITH TOE DOWN |
02/24/2006 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* |
03/27/2006 | ELECTRIC - CABLE DROP | RSUBA | Approved | IVRS - Inspection :* |
03/30/2006 | ELECTRIC - TEMP POWER FOR TEST | RSUBA | Approved | IVRS - Inspection :* 1) POWER TO BE UTILIZED AS DISCUSSED WITH JAY AT CASCADE ELECTRIC |
05/16/2006 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | 1. STUCCO MESH @ ROOF AND SKIM ON MECHANICAL |
07/12/2006 | PLUMBING - ROOF DRAINS | RRICH | Approved | IVRS - Inspection :* |
07/12/2006 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
07/14/2006 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* REVISED APPROVED PLANS ON SITE. |
08/02/2006 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
08/11/2006 | MECHANICAL - HOOD SYSTEMS | JMILITEL | Approved | IVRS - Inspection :* |
08/11/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* FIRE WRAP OK OK FOR CEILING TILES -- 1ST FLOOR |
08/15/2006 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
08/17/2006 | RIGHT OF WAY - FINAL | NBRIGGS | Approved | PER EMAIL |
08/18/2006 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
08/18/2006 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection :* |
08/18/2006 | ELECTRIC - ABOVE CEILING | RSUBA | Approved | IVRS - Inspection :* |
08/18/2006 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
08/18/2006 | ELECTRIC - OUTDOOR LIGHTING | RSUBA | Approved | IVRS - Inspection :* |
08/21/2006 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* |
08/21/2006 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* RECEIVED (1) COPY BACTERIA REPORT OK PROVIDE ANSUL VALVE SIGN LOCATION. |
08/21/2006 | FIRE - FINAL | LLAKEY | Approved | |
08/21/2006 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
08/21/2006 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
08/21/2006 | ELECTRIC - FINAL | RSUBA | Approved | IVRS - Inspection :* |
08/21/2006 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
08/25/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
08/28/2006 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | |
09/14/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
09/15/2006 | ENGINEERING - FINAL | NKALAHAR | Approved | ALL PUNCHLIST ITEMS ADDRESSED |
09/15/2006 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
09/18/2006 | PERMIT FINALED | DROBEY | Approved | |
09/18/2006 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
09/18/2006 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved |