Permit: T05CM02515

Parcel: 128100550


Addresses:

250 S WILLIAMS BL


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T05CM02515

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/18/2006 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
07/13/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REBAR AT SCREEN WALL CLOSURE @ LINE "A" SOUTHEND REBAR AT SOUTH DOCK WALL FROM LINE "E" TO LINE "C"
05/12/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
DUMPSTER FOOTINGS OK
05/05/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LIGHT POLE BASE
6 EACH AROUND BUILDING
04/26/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SEAT WALL FOOTINGS @ EAST SIDE OF BUILDING, FOOTINGS FOR LOADING DOCK WALLS & FOOTINGS FOR SCREENWALLS EAST OF LOADING DOCK.
12/27/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*OK SOUTH STAIR WITH TOE DOWN
12/06/2005 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
11/17/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* REMAINDER OF RAMP WALL FOOTING OK
11/15/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*ALL NORTH RAMP WALL OK, 75' AT EAST END OF SOUTH RAMP WALL
10/10/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F15 SHEAR WALL P.G LINE 3/F.G IVRS - Inspection :*
10/04/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/29/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :* PARKING GARAGE LINE 1 /A.M, LINE2/A.M, LINE3/A-E AND H_? OK TO PLACE
09/20/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING @ A1 OK (F2 AND F1)
09/16/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F9 FOOTING LINE 1 OK TO PLACE
09/14/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) OK TO PLACE F8 FOOTING LINE D WHEN SPECIAL INSP CONFIRMS 11 EACH TRANSVERSE BARS IN TOP MAR AND BF2 ANCHORS
2) OK TO PLACE F10 FOOTING LINE 8 WHEN SPECIAL INSP CONFIRMS BF1 ANCHOR PLACEMENT. NON-STAGGERED LAP SPLICES OK'D BY ENGINEER RFI #81
09/13/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) SPREND FOOTINGS LINE F/1-8 OK TO PLACE (1, 2, 3 TODAY)
2) ELEVATOR PIT SLABS OK TO PLACE
09/09/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) OK TO PLACE SPREAD FOOTING D/7
2) I NEED VERIFICATION FROM DESIGN ENGINEER ON NON-STAGGERED TYPE B ? SPLICES (TOP BARS LOCATION C.5 LINE 8 AND BOTTOM BARS C.6 LINE 8)
3 F-10 FOOTING LINE 8
09/07/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) OK TO PLACE FOLLOWING: SPREAD FOOTINGS; LINE A/2-8, LINE B/2-7, LINE C/2-7, LINE D/2-4 AND LINE E/2-7