Date Description Inspector Results Comments
07/14/2006 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
07/12/2006 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
WAITING ON REVISED CITY APPROVED PLAN FOR PAST NOTES.
01/04/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* PIPE WRAPS & TRAP PRIMER COLUMN LINE # 4 NORTH OK
10/26/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*100 PSI TEST ON 4" H20 BUILDING SUPPLY STUB UP & OUT 5" WEST SIDE OK
PIPE WRAPS & TRAP PRIMERS FROM COLUMN LINE # 4 SOUTH OK. 7-4" RAIN DRAIN STUBS OUT OF BUILDING ON EAST SIDE OK
10/19/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) 3" GREASE WASTE FROM STUB UP AT 3-COMP SINK THRU BLDG THRU GREASE TRAP TO EXISITNG BLDG SEWER
2) WATER TEST OK
10/14/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST WASTE AND VENT UNDERGROUND FOR 4" DRAINAGE FOR P-14, (2) 2" FLOOR SINKS, (1) 3" FLOOR SINK, AND HAND SINK FOR KITCHEN 122 OK
2) USING KEN CAWTHORN SEALED PLAN DATED 9/1/05 FOR RED LINE AT THIS TIME AWAITING CITY APPROVAL OF THIS REVISION
10/13/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* 3" FROM 4" MAIN DRAIN TO P-7 (3) RS-1 FOR SERVING AREA 127 WATER TEST OK
10/03/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* WATER TEST UNDERGROUND ALL AREAS EXCEPT KITCHEN & GREASE WASTE OK
09/23/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* 6" MAIN SANITARY DRAIN FROM NORTH OF ELEVATOR TO END OF LINE CLEANOUT INCLUDING RISERS AND 4" BRANCH TO WEST BETWEEN & 6 & 7 AND 2" FOR 2ND & 3RD FLOOR BREAKROOMS BETWEEN 7 & 8 WATER TEST OK.
09/06/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) 3" GREASE WASTE STUBBED FROM POSSIBLE MAN HOLE EAST TO END OF LINE FCO AND 3" STUB UP FOR GREASE WASTE WATER TEST (PARTIAL)