Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM02515
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
07/12/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* WAITING ON REVISED CITY APPROVED PLAN FOR PAST NOTES. |
|
01/04/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PIPE WRAPS & TRAP PRIMER COLUMN LINE # 4 NORTH OK | |
10/26/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*100 PSI TEST ON 4" H20 BUILDING SUPPLY STUB UP & OUT 5" WEST SIDE OK PIPE WRAPS & TRAP PRIMERS FROM COLUMN LINE # 4 SOUTH OK. 7-4" RAIN DRAIN STUBS OUT OF BUILDING ON EAST SIDE OK |
|
10/19/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 3" GREASE WASTE FROM STUB UP AT 3-COMP SINK THRU BLDG THRU GREASE TRAP TO EXISITNG BLDG SEWER 2) WATER TEST OK |
|
10/14/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST WASTE AND VENT UNDERGROUND FOR 4" DRAINAGE FOR P-14, (2) 2" FLOOR SINKS, (1) 3" FLOOR SINK, AND HAND SINK FOR KITCHEN 122 OK 2) USING KEN CAWTHORN SEALED PLAN DATED 9/1/05 FOR RED LINE AT THIS TIME AWAITING CITY APPROVAL OF THIS REVISION |
|
10/13/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 3" FROM 4" MAIN DRAIN TO P-7 (3) RS-1 FOR SERVING AREA 127 WATER TEST OK | |
10/03/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST UNDERGROUND ALL AREAS EXCEPT KITCHEN & GREASE WASTE OK | |
09/23/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 6" MAIN SANITARY DRAIN FROM NORTH OF ELEVATOR TO END OF LINE CLEANOUT INCLUDING RISERS AND 4" BRANCH TO WEST BETWEEN & 6 & 7 AND 2" FOR 2ND & 3RD FLOOR BREAKROOMS BETWEEN 7 & 8 WATER TEST OK. | |
09/06/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 3" GREASE WASTE STUBBED FROM POSSIBLE MAN HOLE EAST TO END OF LINE FCO AND 3" STUB UP FOR GREASE WASTE WATER TEST (PARTIAL) 2) 6" BLDG DRAIN FROM MANHOLE SOUTH TO ELEVATOR AREA AND WEST TO END OF LINE 4" GCO INCLUDING (3) 2" RISERS FOR ELECTRIC WATER COOLERS ALL FLOORS WATER TEST (PARTIAL), INITIALED AND HIGHLIGHTED ON PLAN IN OFFICE |