Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
6616 E GRANT RD
Apply Date:
04/08/2005
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
TI:RETAIL
Architects:
  • CATALANO, VINCENT VICTOR
Contractors:
  • RED LINE CONSTRUCTION COMPANY INC

Permit Reviews

Permit Number - T05CM01569
Permit Status: C of o
Permit Description: TI:RETAIL
Start Date Submittal Complete Date Status  
03/08/2006 3RD PARTY REVIEW-REVISION/OTHER 03/08/2006 COMPLETED Review Details
04/08/2005 PLANS OK TO SUBMIT - 3RD PARTY 04/08/2005 COMPLETED Review Details
04/08/2005 3RD PARTY REVIEW-COMMERCIAL TI 05/10/2005 COMPLETED Review Details
05/11/2005 POST 3RD PARTY REVIEW 05/17/2005 COMPLETED Review Details
05/19/2005 RESUBMITTAL 06/02/2005 COMPLETED Review Details
06/02/2005 RESUBMITTAL 06/06/2005 COMPLETED Review Details
09/23/2005 3RD PARTY REVIEW-REVISION/OTHER 09/26/2005 COMPLETED Review Details
09/26/2005 POST 3RD PARTY REVIEW 10/04/2005 COMPLETED Review Details
12/28/2005 REVISION 01/12/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM01569
Permit Status: C of o
Permit Description: TI:RETAIL
Total Outstanding Activity Conditions - 1
Date Name
04/08/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T05CM01569
Permit Description: TI:RETAIL
Total Completed Inspections - 30
Date Description Inspector Results Comments
06/17/2005 ELECTRIC - CONSTRUCTION POWER RHOLLAND Approved IVRS - Inspection :*
06/20/2005 PLUMBING - ROUGH, SOIL RRICH Approved 1) SANITARY DRAINAGE SYSTEM UNDERGROUND ONLY WATER TEST TO 10' ABOVE FINISH FLOOR OK PENDING CITY APPROVAL OF RED LINE DRAWING ON SITE. COVER AT OWN RISK. WILL REQUIRE INSTALLATION OF FIXTURE DRAINAGE FITTINGS AND VENT THRU ROOF TEST AT FUTURE DATE
2) CALL IN FOR PIPE WRAP INSPECTION PRIOR TO CONCRETE POUR BACK
3) GREASE WASTE REQUIRES DIRECTIONAL FITTING FOR CLEANOUT ON DOWN STREAM SIDE, CORRECT INSTALLATION ON GREASE TRAP TO GREASE WASTE PIPING. I.E. PIPING AND TRAP SHOULD BE SAME PIPE SIZE. DO NOT COVER GREASE WASTE SYSTEM
06/20/2005 TEP CLEARANCE - AM JKOZUCH Approved CONST POWER
08/15/2005 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
1) OK STUD FRAME WALLS
08/18/2005 PLUMBING - INTERMEDIATE TRINIVJR Approved IVRS - Inspection :*
1) DWV WATER TEST IS OK
2) OVERHEAD WATER DISTRIBUTION IS OK
3) GAS PRESSURE TEST ON ROOF ONLY IS OK
4) ALL CORRECTIONS HAVE BEEN MADE
08/18/2005 FRAMING LHANLY Approved IVRS - Inspection :*
1) OK TO ROCK
2) YOU NEED BACKING FOR GRAB BARS IN RESTROOMS-REFERENCE PP A4 FOR LOCATIONS
3) NEED TO FURR OUT SOUTH WALL IN RESTROOMS SO THAT CENTER OF W.C. IS 16" TO 18" FROM SIDE WALL
4) PROVIDE STAMPED LETTER FROM ARCHITECT TO REVISE DETAIL 1/A4 FROM 25 GA METAL STUDS AT 24" TO 2 X 4 WOOD STUDS AT 16"
10/03/2005 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :* YOU WILL HAVE TO PROVIDE HEATED MAKE UP AIR TO THE KITCHEN. HANGING A HEATER IN THE KITCHEN DOES NOT SATISFY THE PROVISIONS SET FORTH IN SECITON 508.1.1 2000 INC
10/26/2005 MECHANICAL - HOODS JMILITEL Approved IVRS - Inspection :*
1) CHECKED FIRE WRAP
12/14/2005 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :*
ANSWER QUESTIONS
02/03/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
1) AS PER OWNER, DUCT HEATER WILL NOT BE INSTALLED
2) MAKE UP AIR VENTS HAVE BEEN REPOSITIONED SO AS NOT TO CAUSE DISCOMFORT
3) OK FOR FINAL C OF O
02/03/2006 MECHANICAL - HOOD SYSTEMS JMILITEL Approved PER MECH FINAL
02/03/2006 MECHANICAL - ABOVE CEILING JMILITEL Approved PER MECH FINAL
02/03/2006 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
02/03/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
02/03/2006 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*
02/23/2006 OUTDOOR LIGHTING FINAL RSUBA Approved PER EL FINAL
02/23/2006 ELECTRIC - OUTDOOR LIGHTING RSUBA Approved PER EL FINAL
02/23/2006 ELECTRIC - RECONNECT RSUBA Approved PER EL FINAL
02/23/2006 ELECTRIC - FINAL RSUBA Approved IVRS - Inspection :*
03/07/2006 PLUMBING - GAS PRESS TEST FNL RRICH Approved IVRS - Inspection :*
03/07/2006 RIGHT OF WAY - FINAL PWHIDDON Approved PER EMAIL
03/13/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
03/17/2006 FIRE - FINAL LLAKEY Approved
03/17/2006 FIRE - KITCHEN EXH HOOD FINAL LLAKEY Approved
03/22/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved PER PL FINAL
03/22/2006 BUILDING ABOVE CEILING JBURGE Approved PER BU FINAL
03/22/2006 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
06/06/2006 ENGINEERING - FINAL JBRUCKME Approved TEMPORARY C OF O CONTINUED...
1. PATCH ASPHALT AT LANDSCAPE AREA AND ACROSS SOUTH DRIVEWAY. ASPHALT PATCH MUST MATCH EXISTING GRADE AND BE HARD.
2. PROVIDE HANDRAIL AT HANDICAP ACCESS RAMP AT REAR OF BUILDING AND ELIMINATE DEPRESSION AT TOP OF RAMP.
05/14/2007 LANDSCAPE - FINAL ACONNOR Approved
05/21/2007 SIGN - FINAL JYBARRA Approved