Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM01569
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
03/12/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
03/07/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 10 PSI TEST TO ALL APPLIANCES OK 1. CALL IN 03005 AND 03090, 03040 2. PROVIDE REDLINE & APPROVED REVISED PLAN ON SITE 3. PROVIDE IN HOUSE BACKFLOW CERTIFICATION |
|
02/17/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* CALL IN ALL PLUMBING INSPECTIONS THAT HAVE NOT BEEN APPROVED. DO ALL REQUIREMENTS FROM PAST INSPECTIONS. |
|
02/03/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 03005 - PROVIDE RED LINE & REVISED PLAN ON SITE PER 6/20/05 INSPECTION REQUEST THAT REPRESENTS YOUR INSTALLATION 03052 - EXPOSE ALL GAS APPLIANCE LISTING PLATES FOR VIEWING 03090 - SEE NOTES FROM 1/27/06 INSPECTION #1, #3, #4, #5, #9 PAINT EXPOSE SANITARY VENTS ON ROOF THAT ARE ABS PLASTIC MAKE ALL PLUMBING FIXTURES WATER TIGHT IN KITCHEN AREA. |
|
01/27/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL ALL CLEANOUT PLUGS & COVERS 2. PROVIDE TEST GAUGE IN 1/10 POUND INCREMENTS FOR TESTING GAS PIPING 3. PROVIDE SAFETY CABLES FOR ALL GAS APPLIANCES ON WHEELS. 4. INSTALL ALL EQUIPMENT THAT REQUIRE PLUMBING CONNECTION 5. CALL IN ALL PLUMBING INSPECTIONS THAT HAVE NOT BEEN APPROVED 6. TERMINATE WATER HEATER T&P DRAIN AT 90 DEG. DOWN 7. PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER FLUE VENT PIPING. 8. PROVIDE 2' ABOVE PARAPET TERMINATION OF WATER HEATER VENT WHEN WITHIN 8' 9. SANITARY VENT WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER INTAKE THIS MAY NOT BE A COMPLETE LIST |