Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05CM01569

Parcel: 13316021C


Addresses:

6616 E GRANT RD


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T05CM01569

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
05/18/2007 ENGINEERING - FINAL Approved
05/17/2007 ENGINEERING - FINAL Denied 1. PATCH ASPHALT AT LANDSCAPE AREA AND ACROSS SOUTH DRIVEWAY. ASPHALT PATCH MUST MATCH EXISTING GRADE AND BE HARD.
2. PROVIDE HANDRAIL AT HANDICAP ACCESS RAMP AT REAR OF BUILDING AND ELIMINATE DEPRESSION AT TOP OF RAMP.
3. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
06/06/2006 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O CONTINUED...
1. PATCH ASPHALT AT LANDSCAPE AREA AND ACROSS SOUTH DRIVEWAY. ASPHALT PATCH MUST MATCH EXISTING GRADE AND BE HARD.
2. PROVIDE HANDRAIL AT HANDICAP ACCESS RAMP AT REAR OF BUILDING AND ELIMINATE DEPRESSION AT TOP OF RAMP.
03/15/2006 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
1. COMPLETE LANDSCAPE ISLAND AT STREET SIDE OF PROJECT.
2. PROVIDE A 1:12 SLOPED HANDICAP ACCESS RAMP AT NEW PATIO ON BACK SIDE OF BUILDING.
03/07/2006 ENGINEERING - FINAL Denied 1. PROVIDE A PAVED AND STRIPED PEDESTRIAN WALKWAY AROUND THE PERIMETER OF THE BUILDING AS SHOWN ON THE PLAN.
2. PROVIDE STRIPING FOR LOADING ZONE WEST OF BUILDING.
3. SUBMIT A REVISED SITE PLAN TO THE CITY OF TUCSON DEVELOPMENT SERVICES ZONING AND ENGINEERING DIVISIONS FOR REVIEW AND APPROVAL OF THE PATIOS ON THE EAST AND WEST SIDES OF BUILDING. THE PLANS ON SITE SHOW REVISIONS DATED NOVEMBER 2005, HOWEVER THE PLANS WERE APPROVED BY THE CITY IN MAY 2005.
4. PATIOS WITH WROUGHT IRON RAILING, ABOVE GRADE GREASE TRAP, ELECTRICAL EQUIPMENT PANELS, PLUMBING PIPES, A TEP ELECTRIC POLE. AND A SMALL WALL CONFLICT WITH THE AREA DESIGNATED AS A PEDESTRIAN WALKWAY AROUND THE PERIMETER OF THE BUILDING.
6. PROVIDE BICYCLE PARKING AS SHOWN ON THE PLAN.
7. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
8. PATCH ASPHALT PARKING LOT WHERE UNDERGROUND ELECTRICAL WAS INSTALLLED.