Permit: T03CM05445
Permit Details
Apply Date:
11/17/2003
Applicant:
JACQUELINE HUNTOON
Description:
NEW:FELLOWSHIP HALL
Contractors:
- CANYON BUILDING AND DESIGN L L C
Permit Reviews
Permit Number - T03CM05445
Permit Status: C of o
Permit Description: NEW:FELLOWSHIP HALL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2004 | RESUBMITTAL | 02/25/2004 | COMPLETED |
| 02/25/2004 | RESUBMITTAL | 02/25/2004 | COMPLETED |
| 03/05/2004 | RESUBMITTAL | 03/26/2004 | COMPLETED |
| 03/26/2004 | RESUBMITTAL | 04/02/2004 | COMPLETED |
| 05/05/2004 | REVISION | 05/05/2004 | COMPLETED |
| 05/21/2004 | REVISION | 05/21/2004 | COMPLETED |
| 05/21/2004 | REVISION | 05/27/2004 | COMPLETED |
| 05/27/2004 | REVISION | 05/27/2004 | COMPLETED |
| 08/24/2004 | REVISION | 08/24/2004 | COMPLETED |
| 11/17/2003 | PLANS OK TO SUBMIT - SITE | 11/17/2003 | COMPLETED |
| 11/17/2003 | PLANS OK TO SUBMIT - COMM | 11/17/2003 | COMPLETED |
| 11/17/2003 | COMMERCIAL NEW | 01/07/2004 | COMPLETED |
| 11/17/2003 | SITE | 01/07/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM05445
Permit Status: C of o
Permit Description: NEW:FELLOWSHIP HALL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/17/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM05445
Permit Description: NEW:FELLOWSHIP HALL
Total Completed Inspections - 38
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2004 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :* |
| 06/15/2004 | PLUMBING - ROOF DRAINS | RRICH | Approved | IVRS - Inspection :* |
| 06/15/2004 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* |
| 06/16/2004 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :*/ ABOVE CEILING OK FOR SHEET ROCK. |
| 06/22/2004 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :*/ INSPECTED CONDENSATE DRAIN LINES AND SUSPENDED ROUGH DUCT. IN THE FUTURE DO NOT COVER ANYTHING WITH SHEET ROCK WITHOUT HAVING A MECH. INTERMEDIATE INSPECTION FIRST. DO NOT INSTALL CEILING TILES BEFORE ABOVE CEILING INSP. |
| 06/25/2004 | MECHANICAL - PROGRESS | JMILITEL | Approved | IVRS - Inspection :*/ OK FOR CEILING TILES. |
| 07/02/2004 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* |
| 07/16/2004 | ELECTRIC - ABOVE CEILING | JORTA | Approved | IVRS - Inspection :* |
| 07/21/2004 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 07/21/2004 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
| 07/21/2004 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 07/21/2004 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
| 07/30/2004 | MECHANICAL - TEMP PWR FOR TEST | JMILITEL | Approved | IVRS - Inspection :*/ 1) OK FOR TEMP POWER |
| 07/30/2004 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection :* |
| 07/30/2004 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
| 07/30/2004 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
| 07/30/2004 | BUILDING - TEMP POWER FOR TEST | LHANLY | Approved | IVRS - Inspection :* |
| 08/02/2004 | PLUMBING - TEMP POWER FOR TEST | RRICH | Approved | IVRS - Inspection :*/ 1) COMPLETE C-1 PANEL BOARD |
| 08/31/2004 | ELECTRIC - TEMP POWER FOR TEST | JORTA | Approved | IVRS - Inspection :* |
| 09/01/2004 | TEP CLEARANCE - AM | JKOZUCH | Approved | |
| 09/02/2004 | PLUMBING - YARD WTR LINE/TEST | JMILITEL | Approved | IVRS - Inspection :* |
| 10/07/2004 | PLUMBING - PROGRESS | TRINIVJR | Approved | IVRS - Inspection :* |
| 10/08/2004 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection :* |
| 10/20/2004 | ELECTRIC - FINAL | JORTA | Approved | IVRS - Inspection :* |
| 10/20/2004 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection :* |
| 10/20/2004 | ELECTRIC - UNDERGROUND | JORTA | Approved | IVRS - Inspection :* |
| 10/20/2004 | ELECTRIC - UFER | JORTA | Approved | IVRS - Inspection :* |
| 10/26/2004 | FIRE - KITCHEN EXH HOOD FINAL | CSCHULTZ | Approved | |
| 10/28/2004 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 10/28/2004 | RIGHT OF WAY - FINAL | DLEE | Approved | |
| 11/01/2004 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :*/ 1) OK FOR FINAL C OF O |
| 11/02/2004 | NPPO - FINAL | ACONNOR | Approved | |
| 11/02/2004 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 11/02/2004 | FIRE - FINAL | LTHOMAS | Approved | |
| 12/16/2004 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* 1) OK FOR C OF O |
| 12/16/2004 | ENGINEERING - FINAL | DROBERTS | Approved | THE SITE HAS BEEN COMPLETED BUT THE HANDICAP ACCESS RAMPS ARE NOT PER THE ADA STANDARDS. BOBBY/W CANYON DEVELOPING WAS NOTIFIED OF THE EXISTING PROBLEM AS WELL AS VINCE AT 331-1084. |
| 12/16/2004 | ENGINEERING - FINAL | DROBERTS | Approved | C OF O APPROVED |
| 12/30/2004 | PERMIT FINALED | TACHONG | Approved |