Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
| Date |
Description |
Inspector |
Results |
Comments |
| 06/15/2004 |
PLUMBING - ROOF DRAINS |
|
Approved |
IVRS - Inspection :* |
| 06/14/2004 |
PLUMBING - ROOF DRAINS |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 06/14/2004 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
IVRS - Inspection :*/ 3" RAIN DRAINS AND OVERFLOW RAIN DRAIN ON LOWER SECTION OF SMALL BLD TWO SETS WTR TEST OK. NEED TEST TO ROOF HEIGHT ON UPPER ROOF. |
| 05/26/2004 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
IVRS - Inspection :*/ WTR TEST FROM ROOF TO CAPS ON 6" RD AND OFRD 10' NORTH OF BIG BLD. FIVE SETS RAIN DRAIN AND OVERFLOW RAIN DRAIN |
| 05/25/2004 |
PLUMBING - ROOF DRAINS |
|
Not ready for Inspection |
IVRS - Inspection :*/ HAVE WTR TEST ON AT TIME OF INSP. WITH PROPER SUPPORT OF HANGING PIPE. |
| 05/20/2004 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
IVRS - Inspection :*/ TWO SETS 3" RAIN DRAIN AND 3" OVERFLOW RAIN DRAIN ON EAST SIDE OF SMALL BLD TIE INTO 6" SEPERATE RAIN DRAIN AND 6" OVERFLOW RAIN DRAIN RUNNING NORTH APPROX. EVEN WITH NORTH EAST CORNER OF BLD. WTR TEST TO 3' ABOVE FINISHED FLOOR OK PENDING CITY APPROVED PLAN SHOWING SIZE AND ROUTING OF PIPING. COVER AT YOUR OWN RISK. |
| 05/11/2004 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
IVRS - Inspection :*/ FIVE 3" RAIN DRAINS INTO 6" RAIN DRAIN ON EXTERIOR 5' - 3" OVERFLOW RAIN DRAINS INTO 6" RAIN DRAIN ON EXTERIOR - BOTH GO TO CATCH BASIN WTR TEST OK TO 2' NORTH OF SIDEWALK ON NORTH SIDE OF BIG BLD SUBJECT TO CITY APPROVED PLAN OF REDLINES ON JOB. COVER AT YOUR OWN RISK. |
| 05/05/2004 |
PLUMBING - ROOF DRAINS |
|
Partial Approval |
IVRS - Inspection :*/ 3" RAIN DRAIN 5 LOCATIONS WITH OVERFLOW DRAINS ON NORTH SIDE OF BIG BLD. SEPERATE LINES, TIEING INTO 6" COMMON DRAIN TO CATCH BASIN WTR TEST TO 2' ABOVE FINISHED GRADE. THIS SYSTEM WILL REQUIRE CITY APPROVED PLAN WITH PIPE SIZING AND SEPERATE DRAIN AND OVERFLOW PIPING FROM ROOF TO CATCH BASIN. THIS IS PARTIAL TO ONLY WHERE PIPING HEADS NORTH AT SIDEWALK. |