Permit: T03BU02430
Permit Details
Apply Date:
09/22/2003
Applicant:
THE WLB GROUP INC
Description:
GRADING:38,500 CY CUT 38,500 CY FILL
Contractors:
- BORDERLAND CONSTRUCTION COMPANY *C
Permit Reviews
Permit Number - T03BU02430
Permit Status: Final
Permit Description: GRADING:38,500 CY CUT 38,500 CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2009 | REVISION - GRADING | 07/29/2009 | COMPLETED |
| 02/23/2004 | RESUBMITTAL | 03/19/2004 | COMPLETED |
| 03/22/2004 | RESUBMITTAL - GRADING | 06/02/2004 | COMPLETED |
| 06/22/2004 | REVISION - GRADING | 06/23/2004 | COMPLETED |
| 06/23/2004 | REVISION - GRADING | 08/05/2004 | COMPLETED |
| 06/25/2010 | RESUBMITTAL - GRADING ALL | 07/30/2010 | ACTIVE |
| 07/29/2009 | REVISION - GRADING | 08/10/2009 | COMPLETED |
| 09/09/2004 | REVISION - GRADING | 09/09/2004 | COMPLETED |
| 09/09/2004 | REVISION - GRADING | 01/23/2009 | COMPLETED |
| 09/22/2003 | PLANS OK TO SUBMIT - GRADING | 10/02/2003 | COMPLETED |
| 10/02/2003 | GRADING | 11/05/2003 | COMPLETED |
| 11/06/2009 | REVISION - GRADING | 12/03/2009 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T03BU02430
Permit Description: GRADING:38,500 CY CUT 38,500 CY FILL
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2004 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 06/07/2004 | ENGINEERING PRE-CONSTRUCTION | JBRUCKME | Approved | WE REVIEWED THE SWPPP REQUIREMENTS CRAIG DAWSON/ RICHMOND AMERICAN HOMES 275-7371 RANDY DAVIS/ BORDERLAND PROJECT MGR. 730-9763 JEREMY /BORDERLAND BRUSHING OPERATION SUPT. . |
| 07/19/2004 | STORMWATER INSTALL OF CONTROLS | JBRUCKME | Approved | INSTALLATION OF STORMWATER CONTROLS COMPLETE AND APPROVED. BORDERLAND SUPT. TREVEN MADSEN 490-3099 |
| 12/22/2004 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | NO STORM WATER CONCERNS AT THIS TIME. |
| 09/12/2005 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | DENIED AT THIS TIME, THE SITE IS ONLY APPROXIMATELY 70 % COMPLETE AT THIS TIME. MINOR STORMWATER CONCERNS ARE STILL BEING REPAIRED SINCE THE PREVIOUS RAIN. |
| 11/13/2006 | GRADING - INTERMEDIATE | NKALAHAR | Approved | MET WITH MIKE SMITH WITH WLB PERC TESTS HAVE BEEN PERFORMED ON THE BASINS INFORMATION TO BE SENT TO ELIZABETH |
| 11/14/2007 | GRADING - FINAL | NKALAHAR | Approved | MET WITH BILL TERRELL ON SITE EMAIL TO DAVE RE ASSURANCE BOND: From: Nichole Kalahar Zormeier To: David Roberts Date: 11/15/2007 5:57 AM Subject: Canterbury Ranch CC: bill.terrell@mdch.com Dave, I met with Bill Terrell yesterday; he has taken over Craig Dawson's projects. He is hoping to have the assurance bond released. There is still a $62k reseeding bond on the grading permit for this project. I only have one outstanding issue for the basin on Canterbury Tale Dr. and Bill has agreed to take shots, get positive drainage and probably scarify the basin to get it working better. We also still need the basin certification for this project. Corazon Del Pueblo (Habitat for Humanity) has installed the pipes from Canterbury's basin to their SE most basin to help alleviate the drainage problems we saw last summer. Bill is willing to work with us, Habitat and WLB to make sure things are "right". Do you have any outstanding assurance items or can the bond be released? Thanks, Nichole |
| 06/30/2010 | GRADING - TIER REV | eleibol1 | Approved | Toedown inspection accepted 18JUN10. |
| 07/23/2010 | LANDSCAPE INSPECTION | DROBERTS | Approved | SITE HAS BEEN CLEARED FOR ALL PLANT INSTALLATIONS. |