Inspection History Details
Permit: T03BU02430
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2010 | STORMWATER FOLLOW-UP INSP | Approved | PREVIOUS COMMENTS HAVE BEEN COMPLETED. | |
| 07/14/2010 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) REMOVE ALL REMAINING STORMWATER ITEMS FROM THIS SITE. 2) REMOVE ALL LARGE VEGETATION(TREES) IN THE MAIN DRAINAGE WAY. |
|
| 09/03/2009 | STORMWATER FOLLOW-UP INSP | Not Applicable | Mike Smith called for clarification on spillway toedown. | |
| 07/23/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 12/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | STANDING WATER IN BASIN PIC 2866 | |
| 06/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE ALMOST COMPLETE NO STORMWATER CONCERNS AT THIS TIME |
|
| 06/12/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO STANDING WATER | |
| 06/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | STANDING WATER IN BASIN AT 1:41 (20 HOURS AFTER LAST RAIN EVENT) SEE PICTURES 7-9 | |
| 06/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STANDING WATER AFTER LAST NIGHT'S RAIN | |
| 05/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE ALMOST FINISHED WORK ON THE BASINS HAS NOT STARTED NO REVISION HAVE BEEN INITIATED FOR CORRECTIONS TO STANDING WATER PROBLEMS |
|
| 04/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE NEEDS TO BE SWEPT ESPECIALLY AT CONCRETE WASHOUT AREA JASON SALINE MADE AWARE AT MEETING |
|
| 04/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | STREETS NEED TO BE SWEPT-ESPECIALLY AT CONCRETE WASH OUT ON MCKINLEY | |
| 03/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE NEEDS TO BE SWEPT-ESPECIALLY AT CONCRETE WASH OUT | |
| 03/21/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE NEEDS TO BE SWEPT: CANTERBURY TALE AND MILLERS TALE EAST END OF CHAUCERS DR SHIPMANS TALE CT AT CONCRETE WASH OUT ON MC KINLEY |
|
| 03/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK CONTINUES PROJECT ABOUT 80% COMPLETE SOME SWPPP IN PLACE |
|
| 08/15/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | CHECKED ON THE SITE TODAY FOLLOWING THE STORM | |
| 07/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN GOOD CONDITION WITH NO STORM WATER CONCERNS AT THIS TIME. SITE IS ROUGHLY 75% BUILT OUT WITH ALL STORM WATER STRUCTURES IN PLACE. REQUIREMENT FOR BASIN CERTIFICATION WILL BE GIVEN TO SITE SUPERINTENDENT. | |
| 06/09/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN GOOD CONDITION AT THIS TIME, NO STORM WATER CONCERNS AT THIS TIME. | |
| 05/06/2005 | STORMWATER FOLLOW-UP INSP | Approved | THIS SITE IS IN GOOD CONDITION. NO MAJOR STORM WATER CONCERNS AT THIS TIME. | |
| 04/12/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No storm water concerns on this site . Site is under Earth Workers SWPPP monitioring and remains in compliance. | |
| 12/22/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME. | |
| 10/14/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. STABILIZE FILL SLOPE NORTH OF LOTS 6-12. 2. PROVIDE GRAVEL STABILIZED CONSTRUCTION ENTRANCE AND SWEEP STREET OF ALL TRACKING. |
|
| 10/07/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. STRAW BALES WILL BE PLACED IN THE DRAINAGE CHANNEL BEHIND LOTS 47,43,37, & 32 TODAY. 2. THE FILL SLOPES/PERIMETER WALL AT LOTS 6-12 HAS NOT BEEN ADDRESSED. |
|
| 09/30/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. THE FILL SLOPE ON THE NORTH PERIMETER IS OVER-TOPPING THE MULCH SOCK STORMWATER CONTROL. LOTS 6-12 NEED PERIMETER WALL AND FOOTING INSTALLED TO HOLD THE FILL IN THIS AREA. 2. INSTALL STRAWBALES IN DRAINAGE CHANNEL BEHIND LOTS 47,43,37 AND 32. PER SWPPP |
|
| 09/20/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION REQUIRED. 1. MULCH SOCK STILL NEEDS TO BE PLACED ONTOP OF GRADE ALONG THE NORTH PARIMETER. |
|
| 08/16/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | ROUGH GRADING IS COMPLETE. UNDERGROUND UTILITIES ARE IN PROGESS. CONTACT PERSON: SCOTT SEARS 730-5440 1. THE NORTH PERIMETER MULCH SOCK IS BELOW GRADE AT (2) LOCATIONS. ADJUST THE SOCK TO CONTAIN SEDIMENT ON SITE. 2. RE-POST THE NOI AT THE CONSTRUCTION ENTRANCE. |