Permit Number: T03BU02430
Parcel: Unknown

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T03BU02430
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/28/2009 MICHAEL ST. PAUL ZONING REVIEW Needs Review To be reviewed when resubmitted.
02/09/2009 ELIZABETH LEIBOLD ENGINEERING REVIEW Denied DATE: February 13, 2009 (updated after field photos taken for basin function)
SUBJECT: Engineering review of the Canterbury Ranch Closure Documentation
ACTIVITY #: (S02-052) T03BU02430-R as-built closure documentation

SUMMARY: Closure documentation was received by Engineering on January 23, 2009. Development Services Department Engineering Division does not recommend approval of the grading closure documentation until the following comments are addressed:

COMMENTS:
North area:
1) Clean out debris from pipe outlet at east entrance of north basin.
2) Remove trash and debris from basin & east channel areas at north basin.
3) Remove vegetation in the weir-channel at top north edge of north basin.

East area:
4) Install cut-off wall for east spillway system per approved grading plan.
5) Provide erosion control for rivulets on south bank that is eroding. If rip rap is used it shall be with filter fabric or grouted.
6) Trim/remove vegetation at location of cut-off walls.
7) Remove trash & vegetative debris in east channel system.
8) Graffiti was noted on gunite side slopes of east channel system.

West area:
9) The submitted document with elevations needs clarification; provide As-built clarifying locations of elevations for west basin area using approved grading plan, at minimum submit the sheet(s) that pertain to the west basin. Include high point in pavement north of west basin inlet.
10) Remove trash & vegetative debris from basin area & drop inlet structure at west basin outlet area.
11) See photos from recent rain event showing standing water for several days. Basin drain down time appears to not have been achieved. Re-engineering of basin or other solution required.

After field items have been addressed and inspected, please submit response letter and rest of document package with as-built of grading plan sheets pertaining to item 9. For questions, call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Development Services Department
02/20/2009 JOE LINVILLE NPPO REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/29/2009 SUE REEVES APPROVAL SHELF Completed
07/29/2009 SUE REEVES OUT TO CUSTOMER Completed
07/29/2009 SUE REEVES REJECT SHELF Completed