Permit Number: T03BU02430
Parcel: Unknown

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T03BU02430
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2009 ANDREW CONNOR NPPO REVIEW Approved
11/30/2009 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: November 30, 2009
SUBJECT: Engineering review of the Canterbury Ranch Closure Documentation
SUBDIVISION CASE #: S02-052
ACTIVITY #: T03BU02430-R as-built closure documentation

SUMMARY: Closure documentation for Canterbury Ranch including revised as-built sheets 1 and 4 and response letter was received by Engineering for review. The site has been re-checked for full release or grading permit and reseed bond. Planning & Development Services Department Engineering Division does not recommend approval of the grading closure documentation until the remaining comments are addressed:

REMAINING COMMENTS:
East area:
1) Prior to approval, our PDSD Engineering Inspector will need to confirm toedown installation of cut-off wall for east spillway system.

West area:
2) The submitted document with elevations needs clarification; provide As-built clarifying locations of elevations for west basin area using approved grading plan. Include high point in pavement north of west basin inlet. Clarification is needed for high point of road just north of west basin, as well as as-built elevations for inlet and outlet areas of the west basin. Clarification needs to be shown on a sheet that shows the information from the originally approved sheet 5.
General:
3) Submit 2 copies of substantial completion letter.
4) Submit 2 copies of basin function conformance letters.
5) Submit 2 full sets of Final Revised Grading Plan as-builts in next submittal.
6) Submit one copy of the stamped approved grading plan.
7) Submit package with a green card - grading plan application.

After field items have been addressed and inspected, please submit, under activity # T03BU02430, the response letter and rest of closure document package with revised as-built. Include 2 copies each of substantial completion letter, and basin function conformance letters, with all sheets for the as-builts. For questions, or to set up a meeting to go over items to assure that everything has been addressed for next submittal, call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department
11/30/2009 MICHAEL ST. PAUL ZONING REVIEW Denied November 30, 2009

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T03BU02430 Grading Plans for S02-052

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Provide a copy of the last approved revision set for grading.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped tentative plat. Additional comments may be forthcoming.

Final Status

Task End Date Reviewer's Name Type of Review Description
12/03/2009 CPIERCE1 OUT TO CUSTOMER Completed