Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T00CM01082
Permit Details
Apply Date:
03/06/2000
Applicant:
GRESHAM & BEACH ARCHITECTS
Description:
CAR RENTAL/OFFICE: ORIGINAL EFFECTIVE DATE 8-9-02
Contractors:
- TARGET GENERAL INC ,
Permit Reviews
Permit Number - T00CM01082
Permit Status: C of o
Permit Description: CAR RENTAL/OFFICE: ORIGINAL EFFECTIVE DATE 8-9-02
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2002 | REVISION | 02/15/2002 | COMPLETED |
02/21/2001 | REVISION | 03/09/2001 | COMPLETED |
05/18/2001 | REVISION | 05/18/2001 | COMPLETED |
08/23/2000 | 3RD PARTY REVIEW-COMMERCIAL | 01/31/2001 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T00CM01082
Permit Description: CAR RENTAL/OFFICE: ORIGINAL EFFECTIVE DATE 8-9-02
Total Completed Inspections - 35
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2000 | EXCAVATION/LAYOUT REBAR & ZON | DWITT | Approved | |
11/29/2000 | STEM WALL/RETAINING WALL | DWITT | Approved | IVRS - Inspection 0000* |
12/12/2000 | REINFORCED MASONRY PRE-GROUT | DWITT | Approved | IVRS - Inspection 0000* |
08/20/2001 | ELECTRIC - UNDERGROUND | JORTA | Approved | IVRS - Inspection 0000*ROOM 103, 104, AND 105 APPROVED. TELEPHONE AND POWER UNDERGROUND COMPLETE ON WEST SIDE. |
09/04/2001 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000*NO OTHER INSPECTIONS CALLED CONTACTOR IS CALLING FOR TEMP POWER FOR TESTING. TEMP POWER OK PENDING APPROVAL BY OTHER INSPECTORS. |
09/11/2001 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0000*CANCELED AIRPORT CLOSED. |
09/19/2001 | ELECTRIC - TEMPORARY POLE | JORTA | Approved | IVRS - Inspection 0000*TEMP POWER FOR CONSTRUCTION USE SP1 TO TRANSFORM TO DP-1 TO EXTERIOR TEMP SUB PANEL AND RECEPTACLE |
09/21/2001 | BOILER ROUGH | RLOHRMAN | Approved | IVRS - Inspection 0000*OK CALL 602-542-1648 FOR OPERATING CERTIFICAL. |
09/30/2001 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection 0000*1.) PLUMBING YARD WATER LINE/TEST 1.) 2"PVC YARDWATER OK PRESSURE TEST OK 2.) OK TO BACKFILL 3.) NEED TO SEE FINAL PIPING AND CONNECTIONS TO METER. |
10/01/2001 | PLUMBING - FINAL | RMYERS | Approved | 1.) THE WORK ON THIS PERMIT GOES BEYOND A SIMPLE RE-PIPE.YOU HAVE REMOVED FIXTURES TO BE REPLACED AFTER YOU HAVE REMODELED THE BATHROOM.YOU WILL NEED PERMITS TO COVER ALL THE WORK PERFORMED. |
10/15/2001 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*1.) WATER AND OIL SEPARATOR IN CARPET CLEANING ROOM INSTALLED OK UNDERGROUND INSTALL CLEAN-OUTS ON INTERMEDIATE. 2.) OK TO COVER 3.) THIS COMPLETES THE UNDERGROUND PORTION OF THIS CONTRACT. |
10/31/2001 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection 0000*PARTIAL @ TENANT SPACES WALLS APPROVED. XCEPT @ PANEL BOARDS. INSTALLED BELOW FOREIGN PIPING DUCTING ETC. SEE 110-26 99 NEC. |
11/15/2001 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection 0000*1.) PLUMBING INTERMEDIATE OK N/H DWV OK PRESSURE TEST OK ON COPPER OK TO COVER WALL. 2.) WHERE ROOF DRAIN COMBINES WITH OVERFLOW I QUESTION 1 4" ROOF DRAIN AND OVERFLOW DUMPING INTO 3" PIPE OBSTRUCTION FO FLOW 2.) NO SQ FOOTAGE OF DRAINAGE TO VERIFY SIZING. IS PIPE OVERSIZED TO ALLOW COMBINING? 3.) PROVIDE COMPLETE DATA SUPPORTING INSTALLATION. |
11/15/2001 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000*SW AND PART OF SE. ALL EDGES REQUIRE SECREWS TO BE MINIMUM 3/8" FROM EDGE. |
12/04/2001 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection 0000*CHECKED HIGH PRESS DUCTS TO VAV'S BEGINNING LOW PRESS DUCTS TO LINERS PROGRESSING. |
12/06/2001 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
12/17/2001 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000*GRIO LINE 1.8 BARREL SOFFITS ALONG NORTH WALL; STONE. |
12/28/2001 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection 0000*1.) THIS INSPECTION CONCERNS THE COMBINING OF ROOF DRAIN AND OVERFLOW DRAIN FOR THE CANOPY BETWEEN GRID LINES G.H 1.5 AND 8. UNDER THE CODE ENFORCED AT THE TIME THE PLANS WERE APPROVED, THESE DRAINS COULD BE COMBINED IF Z PIPE SIZED LARGER THAN REQ'D SIZE HNTB ARCHETECTS ENGINEERS SUBMITTED PAPER WORK. APPROVING THIS INSTALLATION. 2.) OK TO COVER. |
12/28/2001 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection 0000*CENTER BARREL OK LID OVER DRIVEWAY NEEDS SOME VERTICAL. |
01/08/2002 | ELECTRIC - ABOVE CEILING | JORTA | Approved | IVRS - Inspection 0000*NORTH/SOUTH SOFFIT. INTERMEDIATE SOFFIT AND BARREL SOFFIT. APPROVED. |
05/08/2002 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection 0000* |
05/08/2002 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection 0000* |
05/08/2002 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection 0000* |
05/19/2002 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection 0000*1.) CONTRACTOR DESIRES GAS METER. ALL GAS PIPING COMPLETE. MEDIUM PRESSURE REGULATOR INSTALLED OK 2.) CONNECTIONS, VENTS AND VALVES ON ROUGH PIPING OK 3.) EQUIPMENT SUPPLIED REGULATOR NEED VENTING 4.) AFTER BOND POSTED, AND WITL S.LONGS APPROVAL OK FOR GAS METER. |
05/20/2002 | BOILER FINAL | RMYERS | Approved | 1.) APPROVED BY OTHERS. |
07/02/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
07/18/2002 | SIGN - FINAL | JYBARRA | Approved | |
07/18/2002 | FIRE - FINAL | LTHOMAS | Approved | |
08/09/2002 | PERMIT FINALED | LHANLY | Approved | |
08/09/2002 | BOILER UNFIRED PRESSURE VESSEL | RMYERS | Approved | |
08/09/2002 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
08/09/2002 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
08/09/2002 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
08/09/2002 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
08/09/2002 | BUILDING PRE-SLAB | LHANLY | Approved |