Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/28/2001 |
PLUMBING - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000*1.) THIS INSPECTION CONCERNS THE COMBINING OF ROOF DRAIN AND OVERFLOW DRAIN FOR THE CANOPY BETWEEN GRID LINES G.H 1.5 AND 8. UNDER THE CODE ENFORCED AT THE TIME THE PLANS WERE APPROVED, THESE DRAINS COULD BE COMBINED IF Z PIPE SIZED LARGER THAN REQ'D SIZE HNTB ARCHETECTS ENGINEERS SUBMITTED PAPER WORK. APPROVING THIS INSTALLATION. 2.) OK TO COVER. |
| 09/24/2001 |
PLUMBING - ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*1.) REVIEW TABLE 3-1 HANGERS AND SUPPORTS ESPECIALLY NOTES #1,#2,#3,#4. |