Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
Permit Number - T00CM01082
Inspection Description - MECHANICAL - ABOVE CEILING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2002 | MECHANICAL - ABOVE CEILING | Approved | ||
| 02/04/2002 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*1.) PIPE PRESS REG. BOILER TO DAYLIGHT 1050 24" SQ. COMB GRILLS. 2.) VESTIBLE NEED ADDITIONAL ACCESS PANEL UNDER CONTROL BOX ON VAV. 3.) OK TO COVER REMAINDER OF INTERMEDIATE. | |
| 01/18/2002 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*PARTIAL CONFIRMED ADDITIONAL ACCESS PANELS HAVE BEEN ADDED TO GRID LINE 1.5 WEST SIDE OK TO COVER. | |
| 01/15/2002 | MECHANICAL - ABOVE CEILING | Denied | IVRS - Inspection 0999*STORE FRONT AREA ACCESS TO WATER VALVES, STRAINERS, ON HOT WATER LPS. PROVIDE ACCESS AS NECESSARY, WHERE ACCESS IS NECESSARY. NORTH END REST RM'S. EVAP. COOLER BE CERTAIN PLYSICAL SIZE IS GOING TO LOCATE IN ALLOWED SPACE WITH PROPER ACCESS. VESTIVULE ACCESS TO VAV #10. IS TOTALLY BLKD. SOMETHING NEEDS TO MOVE SOUTH END. | |
| 12/04/2001 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*CHECKED HIGH PRESS DUCTS TO VAV'S BEGINNING LOW PRESS DUCTS TO LINERS PROGRESSING. | |
| 11/28/2001 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*HWS/HWR 80 PSI. NORTH EAST LP. | |
| 11/19/2001 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*PROVIDE ADEQUATE SUPPORT ON WATER LINES AT VAV BOXES. PROVIDE TEST ON ENTIRE SYSTEM. |