Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/01/2002 |
BUILDING ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 05/08/2002 |
BUILDING ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*DENIED PERIMETER WIRES WITHIN 8" OF ALL TERMINAL ENDS OF MAIN & CROSS RUNNERS REQUIRED ON CEILING GRID. |
| 02/01/2002 |
BUILDING ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*ASI 31 REINFORCING FOR DUCT PASS THRUSS. |
| 01/30/2002 |
BUILDING ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*U.B.C. 2504/UBC 2512.3. UBC 2504 1.) HANGERS ARE REQUIRED WITHIN 8' OF ALL PERIMETER WALLS ON MAIN RUNNERS & CROSS RUNNERS. 2.) ALL LIGHT FIXTURES REQUIRE2 HANGERS @ OPPOSITE CORNERS. 3. |
| 12/28/2001 |
BUILDING ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*CENTER BARREL OK LID OVER DRIVEWAY NEEDS SOME VERTICAL. |
| 12/17/2001 |
BUILDING ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000* |