Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2001 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000*1.) WATER AND OIL SEPARATOR IN CARPET CLEANING ROOM INSTALLED OK UNDERGROUND INSTALL CLEAN-OUTS ON INTERMEDIATE. 2.) OK TO COVER 3.) THIS COMPLETES THE UNDERGROUND PORTION OF THIS CONTRACT. |
| 10/11/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) ROOF DRAIN WEST SIDE UNDERGROUND OK WATER TEST RISERS ONLY 2.) OK TO COVER. |
| 10/10/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*ROOF DRAIN CONNECTIONS 4" SEC PLAN 2P202 TEST OK OK TO BACKFILL. |
| 10/01/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 09/25/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*OFFICES ON EAST SIDE 1.) ROOF DRAINS OK WATER TEST OK 2.) DOM. COLD WATER OK PRESSURE TEST OK 3.) N/H DWV OK WATER TEST OK 4.) OK TO COVER WALLS THIS AREA ONLY OK FOR CEILING THIS AREA ONLY. |
| 08/08/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 07/31/2001 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 07/31/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 07/30/2001 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
1.) GO AHEAD AND MAKE FINAL CONNECTION TO RAIN LEADER STUBS 2.) CONNECT LAST THREE DRAINS AND RECALL FOR INSPECTION. |
| 07/27/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) N/H RAIN LEADERS FOR RAEK BLDG LEADERS ALONG SOUTH WALL STUBBED THRU TO OUTSIDE AND TEN FEET UP WALL OK WATER TEST OK 2.) OK TO COVER. |
| 07/25/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) RACK BLDG REVISED PLBG DRAWING APPROVED OK 2.) N/H UNDERGROUND OK WATER TEST OK 3.) OK TO BACKFILL. |
| 07/19/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*MENS BATHROOM #105 WOMEN BATHROOM #106 MECHANICAL ROOM #107 MINUS OIL & WATER SEPARATOR N/H UNDERGROUND OK TO FIVE FEET FROM MAIN WATER TEST TO 10' OK OK TO BACKFILL THESE AREA ONLY. |
| 07/16/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) RAC BLDG MECH RM 1.ROOF DRAINS THRU CONCRETE TO OUTSIDE OK 2.) OK TO POUR. |
| 02/28/2001 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* 1) MECH ROOM UNDERGROUND N/H OK 2) WATER TEST RISERS ONLY 3) OK TO COVER |
| 02/27/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999* 1) HORIZONTAL VENTING BELOW FLOOD LEVEL OF FIXTURE NOT ALLOWED UNLESS STRUCTURAL CONDITIONS PROHIBIT ANY OTHER INSTALLATION |
| 02/22/2001 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999* NO HELP UNABLE TO DO INSP. |