Permit: DP22-0172
Permit Details
Status:
In Review
Type:
Development Package
Address:
2945 N BEAR CANYON RD
Address NEW:
2945 N BEAR CANYON RD
Apply Date:
06/27/2022
Applicant:
Description:
Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
Permit Reviews
Permit Number - DP22-0172
Permit Status: In review
Permit Description: Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 07/10/2025 | REQUIRES RESUBMIT |
| 02/07/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/13/2023 | REQUIRES RESUBMIT |
| 07/27/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/07/2023 | REQUIRES RESUBMIT |
| 10/12/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 12/07/2023 | APPROVED |
| 07/18/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 08/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP22-0172
Permit Status: In review
Permit Description: Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/09/2025 | Arch Culvert subgrade, reinforcing steel, concrete, waterproofing required by design engineer |
Outstanding Inspections
Permit Status: In Review
Permit Number: DP22-0172
Permite Description: Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | NPPO Monitoring | N/A | Partial Pass | Plants have not yet been moved. Clearing and grubbing is underway. Temp nursery will be at South-East of property. |
| 09/04/2025 | SITE - Stormwater Setup and Controls | N/A | Failed | Track pad is not sufficient to maintain no satisfactory conditions on Bear Canyon Road. Eagle Rock Excavation is going to have to set up a wash pad to clean tires prior to entering Bear Canyon. Also required is a full set of plans not 8x11s. Work is not permitted on the site until site SWPPP measures are brought into compliance. DTM has also been made aware of the situation. |
| 10/09/2025 | N/A | Partial Pass | Contractors good to pour the porter around the swimming pool retaining wall | |
| 12/30/2025 | Consultation SITE | N/A | Partial Pass | contract is good to pour the con arch floor, and the wings |
| 01/28/2026 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time everything looks very good out there |
| 12/30/2025 | ENGR - Drainage Structures | N/A | Partial Pass | contractors good to pour the floor the wings of the con arch |
| 07/14/2026 | Grading Progress ENGR | N/A | Partial Pass | Sub-grade for PAAL and parking at East side of site from round-a-bout to south entrance: elevations, dimensions, slopes, and compaction are good. Okay to place AB in this area. |
| 09/17/2026 | ENGR Engineering Final | N/A | Not Ready | |
| 09/17/2026 | ENGR Grading Final | N/A | Not Ready | |
| 09/17/2026 | NPPO Final | N/A | Not Ready | |
| 09/17/2026 | SITE - Zoning Final | N/A | Not Ready | |
| 09/30/2026 | N/A | Partial Pass | irrigation in place on east sides of buildings 1-3. | |
| 05/13/2026 | N/A | Partial Pass | Footer for single screen wall and refuse enclosure at North west corner of site. West Screen wall runs from RE at corner approximately 300’ South. Footer for both wall and RE are correct to detail 109. 6’ Masonary wall & footing. Okay to pour this footer for wall and Refuse enclosure. Schedule inspection when ready with #5 bond beam at grade for pre grout | |
| 10/20/2026 | N/A | Partial Pass | okay to pour sidewalks on south and west sides of building 3 | |
| 09/30/2026 | N/A | Not Ready | ||
| 11/04/2026 | For trash and recycling enclosures | N/A | Partial Pass | 2 Refuse enclosures on north rd center and West corner SOG aprons okay to pour |
| 11/20/2026 | ENGR Paving | N/A | Not Ready | West Road AB inspection-Spillway depressed curb is broken, displaced and elevation is not to plan. AB per plan at spillway should slope 2% downgrade out the spillway- it does not. Across PAAL from spillway handicap parking slope is not correct and curb adjacent to it is over 3%. These issues need to be corrected in addition to other areas that need to be adjusted that I discussed with contractor. Reschedule when ready. |
Completed Inspections
Permit Status: In Review
Permit Number: DP22-0172
Permit Description: Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor about all the testing that needs to be made for the utilities and the call in for the NPO when they’re ready. And to call in as needed for inspections. | |
| 04/21/2025 | NPPO Pre-Construction | Passed | Per on-site discussion all non viable trees scheduled for transplant will be replaced with 24 inch box (total of 11 native trees). After initial grading, the monitoring of the nppo inspections will be completed on DP21-0174 (final placement of the the (11) 24" box native trees). | |
| 09/18/2025 | Passed | Initial grading of site is complete, further grading is underway. | ||
| 09/18/2025 | SITE - Stormwater Setup and Controls | Passed | All SWPPP measures are in place as needed, track out rock is in good condition for the requirements of the site. Automatic bi-weekly inspections will be issued to monitor conditions. | |
| 11/13/2025 | Passed | Okay to grout last 75’ of site wall |
Scheduled Inspections
Scheduled Inspections - DP22-0172
Status: In Review
Description: Revision 1 - Grading/Swppp - The Place at Mason Ranch Apartments.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 02/10/2026 | SITE - Stormwater Follow-up | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.