Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Failed
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP22-0172
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Failed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | SITE - Stormwater Setup and Controls | Failed | Track pad is not sufficient to maintain no satisfactory conditions on Bear Canyon Road. Eagle Rock Excavation is going to have to set up a wash pad to clean tires prior to entering Bear Canyon. Also required is a full set of plans not 8x11s. Work is not permitted on the site until site SWPPP measures are brought into compliance. DTM has also been made aware of the situation. | |
| 09/18/2025 | SITE - Stormwater Setup and Controls | Passed | All SWPPP measures are in place as needed, track out rock is in good condition for the requirements of the site. Automatic bi-weekly inspections will be issued to monitor conditions. |