Inspection Status: Partial Pass
Inspection History
Permit Number - DP22-0172
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2025 | Partial Pass | Contact is good to grout the wall on the north end of the project 525 feet | ||
| 10/09/2025 | Partial Pass | Contractors good to pour the porter around the swimming pool retaining wall | ||
| 10/20/2025 | Partial Pass | Contractor can start going vertical on the retaining wall on the north end | ||
| 10/22/2025 | Partial Pass | contractor is good to pour the footer for the sound wall at Southwest corner going north 266 lineal feet. | ||
| 10/31/2025 | Partial Pass | pool area wall: verts need to extend to top 48" OC, pending photos, okay to grout. | ||
| 11/04/2025 | Partial Pass | Okay to grout north perimeter wall | ||
| 11/13/2025 | Passed | Okay to grout last 75’ of site wall |