Permit: DP22-0172

Parcel: 11451206B

Inspection Status: Not Ready

Inspection History: For trash and recycling enclosures

Date Description Inspector Results Comments
05/05/2026 For trash and recycling enclosures Not Ready Not ready due to rain yesterday/this morning.
05/08/2026 For trash and recycling enclosures Re-inspection required NW dumpster enclosure: footing depth and width are okay. TSM 8-01.9.2 requires 2 #4 bars continuous the length of the footing and vertical reinforcement every 32", current configuration has only 1 continuous bar and 48" OC verts. Also need 2 vertical bars (1 per cell) at the front (east) ends of the wall. Needs to be corrected and reinspected before pouring.
05/15/2026 For trash and recycling enclosures Partial Pass 6' Wall/Footers built to detail 109 in bldg. plans. (Site screen walls and Refuse enclosures)
NE Refuse enclosure footer OK to pour with two rebar's at the end of the wall
Add rebars to ends of walls so there are at 2 NW at gate ends of walls.