Permit: DP22-0172

Parcel: 11451206B

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
04/24/2026 Partial Pass Ramada between bldgs. 2, 3, & 4: four footing, dimensions and reinforcements are good, okay to pour.
05/08/2026 Re-inspection required Site wall along North border: Vertical reinforcement is set up at 48" OC, plan details require 32" OC. Needs to be corrected and reinspected before pouring.
05/13/2026 Partial Pass Footer for single screen wall and refuse enclosure at North west corner of site. West Screen wall runs from RE at corner approximately 300’ South. Footer for both wall and RE are correct to detail 109. 6’ Masonary wall & footing. Okay to pour this footer for wall and Refuse enclosure. Schedule inspection when ready with #5 bond beam at grade for pre grout
05/18/2026 Partial Pass The photo for the trash enclosure needs two number four bars at the front one on each end before they can pour contractor said he would take photos and send them to us
11/20/2025 Not Ready Scheduled to view permit history