Permit: DP22-0172

Parcel: 11451206B

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
01/15/2026 ENGR - Drainage Structures Partial Pass Contract is good to pour the top of the arch culvert
06/22/2026 ENGR - Drainage Structures Partial Pass contractor inform me that trash enclosure on the north east corner of the project will be grouted at 4 foot and then at 6 foot
11/13/2025 ENGR - Drainage Structures Partial Pass Arch inspections should be called in on this item.
12/08/2025 ENGR - Drainage Structures Not Ready Transfers installed with skew, reinstall perpendicular to centerline
12/19/2025 ENGR - Drainage Structures Re-inspection required broken concrete is an unacceptable bar support. Excessive clearance to form and excessive/insufficient cover in multiple areas. All expansion joints are missing chamfer and are not trimmed correctly. Wing reinforcing needs to be trimmed and spliced as appropriate.
12/23/2025 ENGR - Drainage Structures Partial Pass Begin installing outside forms. Approval from EOR required prior to pouring deck.
12/30/2025 ENGR - Drainage Structures Partial Pass contractors good to pour the floor the wings of the con arch