Permit: DP22-0122
Permit Details
Status:
Issued
Type:
Development Package
Address:
4150 E LOS REALES RD
Address NEW:
4150 E LOS REALES RD
Apply Date:
05/09/2022
Applicant:
Adam Jones
Description:
Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Permit Reviews
Permit Number - DP22-0122
Permit Status: Issued
Permit Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/09/2022 | DEV PKG - OK TO SUBMIT | 05/20/2022 | COMPLETED |
| 05/20/2022 | DEV PKG | 08/09/2022 | COMPLETED |
| 09/21/2022 | DEV PKG - RESUBMITTAL | 10/18/2022 | ACTIVE |
| 09/18/2025 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 10/17/2025 | APPROVED |
| 06/20/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 07/28/2025 | REQUIRES RESUBMIT |
| 12/29/2022 | DEVELOPMENT PACKAGE REVIEW v.2 | 01/05/2023 | APPROVED |
| 01/29/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 05/05/2025 | REQUIRES RESUBMIT |
| 10/28/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/09/2022 | REQUIRES RESUBMIT |
| 09/16/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/17/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0122
Permite Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | NPPO Monitoring | N/A | Complete (Recurring) | Nursery’s are in good condition and all plants look extremely healthy. Tree and cactus are separated due to irrigation being used for trees. |
| 05/07/2025 | N/A | Complete (Recurring) | starting grade cut and compaction on the west and north of building 2 for walk and asphalt. | |
| 06/26/2025 | Grading Progress ENGR | N/A | Partial Pass | 06/26/25, Grading in progress on east side, south side of building 3 north side completed and blue topped. In between buildings 2 and 3 ready for blue top. |
| 07/10/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | N/A | Partial Pass | Okay to pour light pole foundations along Los Reales frontage. |
| 07/08/2025 | ENGR Paving | N/A | Partial Pass | 07/08/25, Paving on the east side of building 3 is completed with minor adjustments possibly needed. Curb damage on the south corner, super knows about this. Next inspection should be middle and north side paving. |
| 07/16/2025 | N/A | Partial Pass | This drainage system could possibly be in the right of way but it does have positive pitch at 1.5% and is a triple barrel RCP pipe. Pipe was shaded but could still see the bedding. | |
| 07/18/2025 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Not Ready | 07/18/25, these pictures were taken more than 24 hours after a rain occurrence. Rains stopped the afternoon of the 15th. 3 pictures taken of each basin. Evidence of water table hgt. can be seen on the banks of the basin after the storm had ended. I have several pictures of the basins taken on the 16th. |
| 04/21/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Nursery is also in good shape |
| 10/28/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor has not completed the sidewalk scupper type two over by building two. Will call in for another inspection when completed. |
| COT - ENGR - Signage Final | N/A | Requested |
Completed Inspections
Permit Status: Issued
Permit Number: DP22-0122
Permit Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 11/07/2024 | NPPO Pre-Construction | Passed | ||
| 11/08/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 06/04/2025 | Passed | 06/04/25, All bollards between building 2 and 3 passed. | ||
| 07/15/2025 | ENGR Paving | Passed | 07/15/25, Paving has passed all specs, proper drainage appears to be consistent with the approved plans. | |
| 08/12/2025 | LAND Landscape Appearance & Function Final | Passed | Finish of the landscaping is per plan and looks good. All plants required by plan have been installed. Equipment is in the proper locations. Pressure test have not been completed. NPPO is covered under its own inspection. | |
| 08/12/2025 | NPPO Final | Passed | NPPO is in good shape and has all been transplanted. The continued maintenance of the nursery shows here. All trees and cactus on the NPPO have survived and have been reestablished. | |
| 09/09/2025 | Passed | Cane stakes are coming out now. All at other elements are correct. with the planting. | ||
| 09/09/2025 | Passed | Backflow preventer and meter, are correct to plan. Controller is correct. plants and materials are correct. and Plants look good. | ||
| 09/19/2025 | Passed | Parking areas are now complete and striped according to approved plans. | ||
| 09/24/2025 | ENGR - Drainage Structures | Passed | Drainage pipe outlets and retention basins are complete and in accordance with approved plans. All drainage structures on site for buildings 2 & 3 (building 1 is no longer part of this project). | |
| 09/25/2025 | ENGR Grading Final | Passed | Previous issues have been resolved. Site grading is complete and acceptable. Drainage works as intended. |