Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
4150 E LOS REALES RD
Apply Date:
05/09/2022
Applicant:
Adam Jones
Description:
Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.

Permit Reviews

Permit Number - DP22-0122
Permit Status: Issued
Permit Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Start Date Submittal Complete Date Status  
05/09/2022 DEV PKG - OK TO SUBMIT 05/20/2022 COMPLETED Review Details
05/20/2022 DEV PKG 08/09/2022 COMPLETED Review Details
09/21/2022 DEV PKG - RESUBMITTAL 10/18/2022 ACTIVE Review Details
09/18/2025 DEVELOPMENT PACKAGE NEW REVISION v.3 10/17/2025 APPROVED Review Details
06/20/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 07/28/2025 REQUIRES RESUBMIT Review Details
12/29/2022 DEVELOPMENT PACKAGE REVIEW v.2 01/05/2023 APPROVED Review Details
01/29/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 05/05/2025 REQUIRES RESUBMIT Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/09/2022 REQUIRES RESUBMIT Review Details
09/16/2024 DEVELOPMENT PACKAGE REVIEW v.1 09/17/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP22-0122
Permite Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
02/05/2025 NPPO Monitoring N/A Complete (Recurring) Nursery’s are in good condition and all plants look extremely healthy. Tree and cactus are separated due to irrigation being used for trees.
05/07/2025 N/A Complete (Recurring) starting grade cut and compaction on the west and north of building 2 for walk and asphalt.
06/26/2025 Grading Progress ENGR N/A Partial Pass 06/26/25, Grading in progress on east side, south side of building 3 north side completed and blue topped. In between buildings 2 and 3 ready for blue top.
07/10/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar N/A Partial Pass Okay to pour light pole foundations along Los Reales frontage.
07/08/2025 ENGR Paving N/A Partial Pass 07/08/25, Paving on the east side of building 3 is completed with minor adjustments possibly needed. Curb damage on the south corner, super knows about this. Next inspection should be middle and north side paving.
07/16/2025 N/A Partial Pass This drainage system could possibly be in the right of way but it does have positive pitch at 1.5% and is a triple barrel RCP pipe. Pipe was shaded but could still see the bedding.
07/18/2025 COT - BASN - Drainage/Basin - Condition Inspection N/A Not Ready 07/18/25, these pictures were taken more than 24 hours after a rain occurrence. Rains stopped the afternoon of the 15th. 3 pictures taken of each basin. Evidence of water table hgt. can be seen on the banks of the basin after the storm had ended. I have several pictures of the basins taken on the 16th.
04/21/2025 SITE - Stormwater Follow-up N/A Complete (Recurring) Nursery is also in good shape
10/28/2025 ENGR Engineering Final N/A Partial Pass Contractor has not completed the sidewalk scupper type two over by building two. Will call in for another inspection when completed.
COT - ENGR - Signage Final N/A Requested

Completed Inspections

Permit Status: Issued
Permit Number: DP22-0122
Permit Description: Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
Total Completed Inspections - 12
Date Description Inspector Results Comments
08/19/2024 PDSD Engineering Division Pre-Construction SITE Passed
11/07/2024 NPPO Pre-Construction Passed
11/08/2024 SITE - Stormwater Setup and Controls Passed
06/04/2025 Passed 06/04/25, All bollards between building 2 and 3 passed.
07/15/2025 ENGR Paving Passed 07/15/25, Paving has passed all specs, proper drainage appears to be consistent with the approved plans.
08/12/2025 LAND Landscape Appearance & Function Final Passed Finish of the landscaping is per plan and looks good. All plants required by plan have been installed. Equipment is in the proper locations. Pressure test have not been completed. NPPO is covered under its own inspection.
08/12/2025 NPPO Final Passed NPPO is in good shape and has all been transplanted. The continued maintenance of the nursery shows here. All trees and cactus on the NPPO have survived and have been reestablished.
09/09/2025 Passed Cane stakes are coming out now. All at other elements are correct. with the planting.
09/09/2025 Passed Backflow preventer and meter, are correct to plan. Controller is correct. plants and materials are correct. and Plants look good.
09/19/2025 Passed Parking areas are now complete and striped according to approved plans.
09/24/2025 ENGR - Drainage Structures Passed Drainage pipe outlets and retention basins are complete and in accordance with approved plans. All drainage structures on site for buildings 2 & 3 (building 1 is no longer part of this project).
09/25/2025 ENGR Grading Final Passed Previous issues have been resolved. Site grading is complete and acceptable. Drainage works as intended.

Documents

File Name Document Type  
DP22-0122 CONFORMED SET REVISION 2.PDF DOCUMENTS VIEW
4329A - REV 2 - DP RESPONSE LETTER - 1ST__V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL_DP REVISIONS NARRATIVE COT_2025.01.17_V1.PDF DOCUMENTS VIEW
REVISION 2 - APPROVED - UPDATED PAGES ONLY - 4329A - DEVELOPMENT PACKAGE - 2025_09_16_REV2_V1 -STAMPED 10.17.2025.PDF DOCUMENTS VIEW
4329A - DEVELOPMENT PACKAGE - 2024_08_24_REV1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW