Permit: DP22-0122

Parcel: 14044004C

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
05/27/2025 ENGR - Drainage Structures Partial Pass 05/27/05, Drainage structure in the middle section of the 3 barrel drain pipe on the southwest corner of building 2.
05/30/2025 ENGR - Drainage Structures Partial Pass 05/30/25, Nyoplast drainage structures are good to backfill on the last section of the southwest 3 barrel section of pipe.
06/02/2025 ENGR - Drainage Structures Canceled
06/03/2025 ENGR - Drainage Structures Partial Pass 06/03/25, Drainage structure Middle and East of building 2 good to backfill.
06/04/2025 ENGR - Drainage Structures Partial Pass 06/04/25, Drainage Nyoplast structure on the east side run passed.
06/25/2025 ENGR - Drainage Structures Partial Pass 06/25/25, as an as built drainage will be added to the two parking areas on the south side of building 2 for drainage into the large basin.
08/12/2025 ENGR - Drainage Structures Passed 08/12/25, Mag Wells are now open and certified.
09/24/2025 ENGR - Drainage Structures Passed Drainage pipe outlets and retention basins are complete and in accordance with approved plans. All drainage structures on site for buildings 2 & 3 (building 1 is no longer part of this project).