Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - DP22-0122
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | ENGR - Drainage Structures | Partial Pass | 05/27/05, Drainage structure in the middle section of the 3 barrel drain pipe on the southwest corner of building 2. | |
| 05/30/2025 | ENGR - Drainage Structures | Partial Pass | 05/30/25, Nyoplast drainage structures are good to backfill on the last section of the southwest 3 barrel section of pipe. | |
| 06/02/2025 | ENGR - Drainage Structures | Canceled | ||
| 06/03/2025 | ENGR - Drainage Structures | Partial Pass | 06/03/25, Drainage structure Middle and East of building 2 good to backfill. | |
| 06/04/2025 | ENGR - Drainage Structures | Partial Pass | 06/04/25, Drainage Nyoplast structure on the east side run passed. | |
| 06/25/2025 | ENGR - Drainage Structures | Partial Pass | 06/25/25, as an as built drainage will be added to the two parking areas on the south side of building 2 for drainage into the large basin. | |
| 08/12/2025 | ENGR - Drainage Structures | Passed | 08/12/25, Mag Wells are now open and certified. | |
| 09/24/2025 | ENGR - Drainage Structures | Passed | Drainage pipe outlets and retention basins are complete and in accordance with approved plans. All drainage structures on site for buildings 2 & 3 (building 1 is no longer part of this project). |