Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP22-0122
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Site looks great, no concerns | |
| 01/29/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | A few wattles need to be worked on, on the south west corner, other than this there are no other concerns. | |
| 02/21/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Wattle needed to be repaired on the east side of the south corner of building 3. | |
| 03/10/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Have a full set for the DP on site please | |
| 03/25/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No Concerns | |
| 04/21/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Nursery is also in good shape | |
| 06/20/2025 | SITE - Stormwater Follow-up | Partial Pass | SWPPP is in good condition | |
| 07/16/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | once the berm is 100% completed and all basins are done a Notice of Termination can be submitted for the final Storm Water inspection to be completed. | |
| 08/12/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | 08/12/25, noted there is a swale missing on the southeast corner of the site between the 2 buildings that diverts the water to the east basin. All trash will need to be cleaned up on the far southeast corner of the project and this area needs to be raked/ripped to create a pervious surfaces so water does not stand here for longer than the allowed 24 hr time period. The lot itself has several areas of standing water that needs to be addressed prior to the engineering final. The rip rap berm on the southeast corner middle side is being impacted by pour drainage and a missing swale |
|
| 11/26/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Just maintain the track outs on this trip. | |
| 12/27/2024 | SITE - Stormwater Follow-up | Complete (Recurring) |