Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2025 |
|
|
Partial Pass |
05/05/25, storm drain on the north west corner of building two. Good to backfill, 2.3% pitch. |
| 05/07/2025 |
|
|
Complete (Recurring) |
05/07/25, first section of 30” pipe on the southwest corner of the site. Good to backfill. |
| 05/09/2025 |
|
|
Partial Pass |
05/09/25, southeast corner 2nd section of pipe good to backfill. |
| 05/14/2025 |
|
|
Partial Pass |
05/14/25, trench and pipe are good to backfill. |
| 05/19/2025 |
|
|
Partial Pass |
05/19/25, Passed the south 12"pipe from the west end of the large basin to the Y on the east side. |
| 05/20/2025 |
|
|
Partial Pass |
05/20/25, this is for the remainder of 12" pipe going between basins on the south side of buildings 2 & 3. |
| 05/30/2025 |
|
|
Partial Pass |
05/30/25, The thermoplastic drainage pipe is good to backfill on the last section of the southwest 3 barrel section of pipe. |
| 07/16/2025 |
|
|
Passed |
This drainage system could possibly be in the right of way but it does have positive pitch at 1.5% and is a triple barrel RCP pipe. Pipe was shaded but could still see the bedding. |