Permit: DP22-0122

Parcel: 14044004C

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
05/05/2025 Partial Pass 05/05/25, storm drain on the north west corner of building two. Good to backfill, 2.3% pitch.
05/07/2025 Complete (Recurring) 05/07/25, first section of 30” pipe on the southwest corner of the site. Good to backfill.
05/09/2025 Partial Pass 05/09/25, southeast corner 2nd section of pipe good to backfill.
05/14/2025 Partial Pass 05/14/25, trench and pipe are good to backfill.
05/19/2025 Partial Pass 05/19/25, Passed the south 12"pipe from the west end of the large basin to the Y on the east side.
05/20/2025 Partial Pass 05/20/25, this is for the remainder of 12" pipe going between basins on the south side of buildings 2 & 3.
05/30/2025 Partial Pass 05/30/25, The thermoplastic drainage pipe is good to backfill on the last section of the southwest 3 barrel section of pipe.
07/16/2025 Passed This drainage system could possibly be in the right of way but it does have positive pitch at 1.5% and is a triple barrel RCP pipe. Pipe was shaded but could still see the bedding.