Permit: DP21-0067
Permit Details
Status:
Complete
Type:
Development Package
Address:
7248 E VOYAGER RD 7500
Address NEW:
7248 E VOYAGER RD 7500
Apply Date:
03/12/2021
Applicant:
Description:
Site/Grading/Swppp/Floodplain - Voyager Mobile Home Park. Phases One.
Permit Reviews
Permit Number - DP21-0067
Permit Status: Complete
Permit Description: Site/Grading/Swppp/Floodplain - Voyager Mobile Home Park. Phases One.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/20/2022 | DEV PKG - RESUBMITTAL | 04/07/2022 | COMPLETED |
| 03/12/2021 | DEV PKG - OK TO SUBMIT | 03/31/2021 | COMPLETED |
| 03/31/2021 | DEV PKG | 05/19/2021 | COMPLETED |
| 08/03/2022 | DEV PKG - RESUBMITTAL | 09/21/2022 | COMPLETED |
| 10/05/2022 | DEV PKG - RESUBMITTAL | 10/13/2022 | ACTIVE |
| 08/09/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/19/2023 | APPROVED |
| 11/16/2023 | DEVELOPMENT PACKAGE NEW v.1 | 02/20/2024 | APPROVED |
| 10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/06/2022 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0067
Permite Description: Site/Grading/Swppp/Floodplain - Voyager Mobile Home Park. Phases One.
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | COT - SITE - Zoning Intermediate | N/A | Complete (Recurring) | This site is talking about substantial completion of phase 1 by Mid October. I'm requesting this as a supplement just to see where the site progress really is. contractor has installed the curb and cut in rough grade for the roads placing A B . |
| 11/16/2023 | SITE - Stormwater Setup and Controls | N/A | Not Ready | 1) Engineer letter needed for all areas concerning storm water controls to certify that they are implemented per plan. 2) Remove all T-post from perimeter of site. 3) Implementation of a stock pile plan is needed. 4) Clean up,on the south east corner of all trash. |
| 02/15/2024 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | THE CONTRACTOR CONTINUE TO WORK ON THE BASIN ON THE WEST SIDE OF THE PROJECT WITH LANDSCAPE INSTALLING IRRIGATION PVC AND RIP RAP. |
| 02/21/2024 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | Contractor needs to finish the landscaping and placing the DG. Move all the spoils that are on the north east quadrant of the project. |
| 07/02/2024 | N/A | Partial Pass | Contractor is backfilling the pipe with gravel be completed at the end of the day | |
| 07/17/2024 | SITE | N/A | Not Ready | WHIA-1, seams to be working as designed, water looks to be held appropriately at the 3' mark and it seems now the water line is at approximately 1'-6''. Outlet to street should have the wattle removed on the street side of the outlet. WHIA-2, In this area there doesn't seam to be anywhere where water could collect to be considered as water harvesting. Everything seams to flow towards the drain/swale areas and to the street. WHIA-3 Is on the outside of the site on Voyager Rd. It seams to be working as designed. Again wattle on the street side of the outlet should be removed for proper flow. WHIA-4 AT Walnut Creek and Fossil Creek intersection, on the outside of the corner. This area is being impacted by sediment build up due to no SWPPP in place in the interior of the project and will very soon need to be cleaned up. This area is holding water over the 24 hour period. WHIA-4 at Walnut Creek and Fossil Creek intersection, on the inside corner. This area if to be water harvesting cannot be seen, there looks to be a swale rather then a depression. WHIA-4 at Fossil Creek just before Boulder Creek intersection on the west side. This area is working properly but inlet again is being impacted by sediment due to no SWPPP in place. WHIA-4 All other areas with this tag are if meant to be Water Harvesting are flat with no retention. WHIA-5 at the cult de sac at the east end of Old Trails Rd. This area is being impacted by silt due to no SWPPP being in place. WHIA-5 at the south side of the property going from east to west. This area seams to be working well, flow,going in both directions and a minor bit of retention for plant watering. |
| 03/11/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns, everything is clean and looking good. |
| 02/21/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | are contractor needs to finish installing the DG. Remove the spoils on the north east quadrant of the project. The basin on the north east side of the project continues to hold water. Contractor needs to address that with the engineer. |
| 02/15/2024 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | THE CONTRACTOR CONTINUE TO WORK ON THE BASIN ON THE WEST SIDE OF THE PROJECT WITH LANDSCAPE INSTALLING IRRIGATION PVC AND RIP RAP. |
| 04/22/2025 | SITE - Zoning Final | N/A | Not Ready | Zoning final requires all rezoning conditions be met. C9-19-17 - 8 requires an 8 foot wide path be constructed along one side of the of the open space parallel to the north fork of Airport Wash. This path is currently not constructed. |
| 12/19/2023 | ENGR Engineering Final | N/A | Partial Pass | Contractor still needs to plant all the plants out of the nursery area. I am in the area on the north east part of the project needs to be completed per plan. And the basin by the nursery needs to be completed also |
| 04/22/2025 | ENGR Grading Final | N/A | Not Ready | We have piles of debris scattered throughout the site, please remove these and all washout areas. |
| 04/22/2025 | SITE - Stormwater Final Inspection | N/A | Not Ready | Some type of control will have to be in place on the unfinished lots. Right now we have the issue of rain washing sediment into streets and basins. This happened last summer and it was wrote up in the same manner, nothing has changed. We have piles of debris scattered throughout the site, please remove these and all washout areas. |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0067
Permit Description: Site/Grading/Swppp/Floodplain - Voyager Mobile Home Park. Phases One.
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2023 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | Passed | Met Mr. Tree on the site Make it to work there and get me going over the next two weeks removing all the vegetation planning it into a nursery and preparing the site for construction phase 1 | |
| 02/17/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Holy went back hole on the side today no other work appears being performed looks like the contractor is removing part of the excess of material that has been placed on this site over the years also working on flagging and tagging all MPPO plants that will either be removed from the site or preserved and placed or transplant it on site all transplants will be going into a nursery located at the beginning of the project next to next to the adjacent subdivision | |
| 06/20/2023 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
| 10/20/2023 | COT - SITE - Zoning Intermediate | Passed | ||
| 11/16/2023 | SITE - SWPPP Correction Notice | Passed | ||
| 11/16/2023 | SITE - SWPPP Violation Notice | Passed | ||
| 11/16/2023 | SITE - Zoning Compliance | Passed | ||
| 11/16/2023 | COT - ENGR - Signage Final | Passed | ||
| 12/19/2023 | COT - ENGR - Site - Assurance Release | Passed | ||
| 04/03/2024 | ENGR - Drainage Structures | Passed | NO trash enclosure is located on this site that would require a site excavation or layout rebar inspection by us. | |
| 05/13/2025 | ENGR Engineering Final | Passed | ||
| 05/13/2025 | ENGR Grading Final | Passed | ||
| 05/13/2025 | SITE - Stormwater Final Inspection | Passed |