Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP21-0067
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2023 | SITE - Stormwater Setup and Controls | Not Ready | 1) Engineer letter needed for all areas concerning storm water controls to certify that they are implemented per plan. 2) Remove all T-post from perimeter of site. 3) Implementation of a stock pile plan is needed. 4) Clean up,on the south east corner of all trash. |