Permit: DP21-0067

Parcel: 14125005B

Inspection Status: Partial Pass

Inspection History: Final inspection to ensure all landscape and water harvesting SITE

Permit Number - DP21-0067

Inspection Description - Final inspection to ensure all landscape and water harvesting SITE

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/15/2024 Final inspection to ensure all landscape and water harvesting SITE Partial Pass THE CONTRACTOR CONTINUE TO WORK ON THE BASIN ON THE WEST SIDE OF THE PROJECT WITH LANDSCAPE INSTALLING IRRIGATION PVC AND RIP RAP.
04/22/2025 Final inspection to ensure all landscape and water harvesting SITE Not Ready Retention basin, sheet 70 not in place.
Decomposed granite 8' walking path missing, east side of project.
5 dead ocotillo at pool landscaping.
07/03/2024 Final inspection to ensure all landscape and water harvesting SITE Passed