Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | are contractor needs to finish installing the DG. Remove the spoils on the north east quadrant of the project. The basin on the north east side of the project continues to hold water. Contractor needs to address that with the engineer. | |
| 04/22/2025 | PDSD Site/Engineering Division - Landscaping | Not Ready | Retention basin, sheet 70 not in place. Decomposed granite 8' walking path missing, east side of project. 5 dead ocotillo at pool landscaping. |